Laserfiche WebLink
<br />2 <br />3 <br /> <br />Satellite monitoring system maintenance; <br />In-stream flow engineering support services; <br />Continuation of the South Platte decision support system; <br />Continuation of the document imaging system and <br />integrated water information center; <br />Continuation of the Colorado floodplain map <br />modernization; <br />Continuation of the weather modification program; <br />Enhanced sllowpack a~sessment program; <br />Continuation of the flood hazard mitigation program; <br />Floodplain technical services; <br />Republican river water conservation district operations; <br />Oak creek reservoir feasibility study; <br />Arkansas valley drainage study; <br />Continuation of the statewide water supply initiative; and <br />Conservation reserve enhancement program. <br />Restores the balance in the flood response fund to $150,000. <br /> <br />I Be it enacted by the General Assembly of the State of Colorado: <br /> <br />SECTION 1. Water project loan authorizations from the <br />severance tax trust fund perpetual base account. (I) Pursuant to <br /> <br />4 section 39-29-109 (I) (a) (1), Colorado Revised Statutes, the Colorado <br /> <br />5 water conservation board is hereby authorized to loan moneys from the <br /> <br /> <br />6 severance tax trust fund perpetual base account to enable the construction <br /> <br /> <br />7 of the following water resources projects with the following priority: <br /> <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br /> <br />Priority <br /> <br />(a) <br /> <br />Borrower-Project <br />Central Colorado Water Conservancy <br />District Well Augmentation Sub-district <br />Water Rights Purchase and Construction of <br /> <br />Loan Amount <br /> <br />Lined Gravel Pit Water Storage* - <br /> <br />.$ 20.200.000 <br />$ 20,200,000 <br /> <br />Total <br /> <br />15 <br /> <br />14 *This loan is to refinance projects wholly or partially completed. <br /> <br />(2) The Colorado water conservation board may make loans for <br /> <br />16 the construction of the project specified in subsection (I) of this section <br /> <br />-2- <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />084 <br />