My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01709
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01709
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:06:12 PM
Creation date
10/4/2006 7:01:18 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/3/1985
Description
Agenda, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />" <br /> <br />Aqenda Item 14 - Fundinq for SCS Snow Survey <br /> <br />Chairman Johnston discussed this item by calling attention <br />to the fact that the President's FY 1986 bUdget request <br />proposes that the snow survey program administered by the U. S. <br />Soil Conservation Service be terminated after the next fiscal <br />year. He emphasized that the water supply and runoff forecasts <br />derived from the snow course measurements are of vital <br />importance to Colorado's water users. He suggested that the <br />Board take action supporting the continuation of the federal <br />program by approving a resolution which had been prepared by <br />Mr. McDonald. <br /> <br />Mr. Lochhead moved, seconded by Mr. Vandemoer, that the <br />Board approve the proposed resolution as written. Motion <br />adopted unanimously. (A copy of the proposed resolution is <br />inc~uded as Appendix G). <br /> <br />Aqenda Item 15 - Closed Basin project, Staqe 5 Wells <br />(Appendix H) <br /> <br />Board Member Raymond Wright addressed this item by stating <br />that the Bureau of Reclamation. the agency constructing the <br />Closed Basin ProJect. wishes to commence construction of <br />salvage wells i~ Stage 5 of the project in November 1985. <br />Pursuant to the project authorizing act. construction may be <br />undertaken in stages only if construction of each successive <br />stage after stagel is consented to by the Colorado Water <br />Conservation Board and the Rio Grande Water Conservation <br />District. To insure that there is sufficient lead time to <br />acquire rights-of-way for the stage 5 salvage wells, the Bureau <br />needs the Board's and. the District's consent to proceed at this <br />time. A draft resolution granting this consent was attached to <br />Mr. McDonald's April 22, 1985, memorandum to the Board relevant <br />to this item. <br /> <br />Mr. Wright moved. seconded by Mr. Vandemoer, that the Board <br />adopt the resolution and instruct Mr. McDonald to forward <br />certified copies of the resolution to the District and to <br />appropriate officials of the Bureau of Reclamation. Motion <br />approved unanimously. <br /> <br />Aqenda Item 16 - Floodplain Resolutions (Appendix I) <br /> <br />Mr. McDonald discussed briefly the fOllowing floodplain <br />resolutions which were more fully described in his April 23, <br />1985, memorandum to the Board: <br /> <br />a. Flood Insurance Study. Town of Green Mountain Falls, EI <br />Paso and Teller Counties. Colorado, dated December 19, 1984 <br />(Resolution No. 237) <br /> <br />-11- <br />
The URL can be used to link to this page
Your browser does not support the video tag.