My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01682
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01682
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:05:43 PM
Creation date
10/4/2006 7:00:54 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/27/2004
Description
Updated 2004 State Legislative Issues
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. <br /> <br />REDRAFT <br />1-14-04 <br /> <br />Doubleunderlininll: <br />denoteschanll:esfrom <br />I Colorado water conservation board is hereby authorized to loan moneys .,;o,d..1> <br /> <br />2 from the Colorado river recovery program loan fund to enable the <br /> <br /> <br />3 construction of the following water resources projects: <br /> <br />Priority <br /> <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br /> <br />(a) <br /> <br />Borrower - Project <br />Western Area Power Administration- <br /> <br />Loan Amount <br /> <br />Capital projects of the Upper Colorado <br /> <br />and San Juan River Basins Recovery <br />Implementation Program <br /> <br />Total <br /> <br />$ 5.938.800 <br />$ 5,938,800 <br /> <br />10 (2) The Colorado water conservation board may make loans for <br /> <br />II the construction ofthe projects specified in subsection (I) of this section <br /> <br /> <br />12 from such moneys as are or may hereafter be transferred to the Colorado <br /> <br /> <br />13 river recovery program loan fund from !he Colorado water conservation <br /> <br /> <br />14 board construction fund. The loans shaH be in the amounls listed in <br /> <br />15 subsection (I) ofthis section, plus or minus such amounts, ifany, as may <br /> <br /> <br />16 be justified by reason of ordinary fluctuations in construction costs as <br /> <br />17 indicated by the engineering cosl indices applicable to the types of <br /> <br />18 construction required for each project or as may be justified by reason of <br /> <br /> <br />19 changes in the plans for a project due to differing or unforeseen site <br /> <br />20 conditions, errors or omissions in the plans and specificalions, changes <br /> <br />21 instituted by regulatory agencies, or changes in material quantities <br />22 beyond contract limits. <br /> <br />23 (3) Pursuant to section 37-60-120 (I), Colorado Revised Statutes, <br /> <br />24 the board shaH require such terms and conditions in the contracts as will <br /> <br />25 ensure repayment of funds made available by it. The board shaH not <br />26 disburse any moneys for any loan au!horized by subsection (I) of this <br /> <br />27 sectiop unless and until the board is satisfied, in its sole discretion, that <br /> <br />-17- <br /> <br />DRAFT <br />
The URL can be used to link to this page
Your browser does not support the video tag.