My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01678
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01678
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:05:41 PM
Creation date
10/4/2006 7:00:31 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/24/1995
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br />23. <br /> <br />e27, <br /> <br />e/scm <br /> <br />b. Town of Dove Creek - Proposed Use of Dolores WCD Appropriation for a Pipeline Project <br />c, Trinchera Irrigation Co. - Mountain Home Reservoir <br /> <br />Reconnaissance and Feasibility Studies (3:05 - 3:25) <br />a, Small Dam Site Reconnaissance Program <br />b. Town of Silt <br />c. Beaver Reservoir Co. <br />d. Town of Norwood <br />e. V ouga Reservoir Association <br /> <br />24, <br /> <br />Arkansas River Augmentation Loan Account (3:25 - 3:45) <br />a. Lower Arkansas Water Management Association <br />b. Southeastern Colorado Water Conservancy District <br /> <br />25. <br /> <br />Emergency Infrastructure Repair Account (3 :45 - 4:05) <br />a. Peck, Pella, and Clover Basin Ditch Companies <br />b. South Flat Ditch Company <br />c. South Branch Diversion <br />d. Julesburg Irrigation District - Harmony Ditch No. 1 <br />e. Additional Items If Necessary <br /> <br />26. <br /> <br />Small Project Loan Account (4:05 - 4:15) <br />a, Caryl Carroll - DD&E Wise Dam Rehab <br /> <br />Design and Construction Status Report (4: I 5 - 4:25) <br /> <br />28. <br /> <br />Design and Construction - A Closer Look (4:25 - 4:45) <br /> <br />29. <br /> <br />Future Meetings and Workshops (4:45 - 5:00) <br /> <br />August, 1995 <br />September, 1995 <br />September 7-8, 1995 <br />October 1995 <br />November 6-7, 1995 <br />December 1, 1995 <br />January 1996 <br />March 1996 <br />May 1996 <br /> <br />Denver (proposed workshop) <br />Craig - (proposed special meeting) <br />Lamar (in conjunction with ARCC) <br />Grand Junction (proposed special meeting) <br />Denver <br />Denver (special meeting) <br />Denver <br />To be set <br />To be set <br /> <br />Adjournment <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.