Laserfiche WebLink
<br />27. <br /> <br />Design and Construction Status Report <br />Due to time constraints, this item was tabled until the September meeting <br /> <br />28. Design and Construction - A Closer Look <br />Due to time constraints, this item was tabled until the September meeting <br /> <br />29. Future Meetings and Workshops <br />Tape 5 Start/Stop 2541 - 2873 <br />Action: After discussion, the schedule of future workshops and meetings is as <br />follows: <br /> <br />August 31, 1995 <br />September 7-8, 1995 <br />October 10, 1995 <br />October 11, 1995 <br />November 6-7, 1995 <br />December I, 1995 <br />January 23-24, 1996 <br />March 1996 <br />May 1996 <br /> <br />Denver (proposed workshop/subcommittee) <br />Lamar (in conjunction with ARCC) <br />Grand Junction (special meeting) <br />Craig (special meeting) <br />Denver <br />Denver (special meeting) <br />Northglenn, Colorado <br />To be set <br />To be set <br /> <br />w:\boardmem\juI95\minutesjul <br />8/22/95scm <br /> <br />Minutes July 24-25, 1995 CWCB Meeting <br /> <br />.." <br /> <br />.. <br /> <br />. <br /> <br />. <br /> <br />. <br />