My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01663
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01663
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:05:04 PM
Creation date
10/4/2006 7:00:04 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
8/6/1969
Description
Agenda or Table of Contents, Minutes, Memos
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />miles. A qated outlet works with a low- <br />level inlet would be provided to regulate <br />reservoir discharges. The outlet works <br />would consist of a concrete intake struc- <br />ture, a concrete conduit, and a stilling <br />basin at the downstream end of the conduit. <br />A rock-cut spillway would be provided in <br />the left abutment of the dam. At full <br />pool the reservoir surface area would be <br />1,740 acres. utilization of the sediment <br />pool for recreation would provide a lake <br />having 230 acres of surface area. Total <br />cost of the Castlewood Dam and Reservoir <br />is estimated to be $24,967,000. <br /> <br />Over the years, the channel downstream <br />from the Cherry Creek dam has been deterio- <br />rating. Areas adjoining the channel have <br />become more intensively developed and <br />greate~ runoff can be expected. Unless <br />the channel capacity is retained, opera- <br />tion of the Cherry Creek project could be <br />curtailed. It is proposed, therefore, <br />that the Cherry Creek channel be improved <br />in the reach from the dam downstream to <br />the South Platte River. The improvement <br />would consist of clearing, enlarging and <br />stabilizing of about 12 miles of the ex- <br />isting channel, thereby increasing its <br />flow capacity to permit unrestricted <br />operation of the dam. The channel would <br />be further enlarged to provide standard- <br />project-flood protection and make the <br />area essentially free from flood flows <br />entering downstream from the Cherry Creek <br />Dam. Total cost of the Cherry Creek <br />channel improvement project is estimated <br />to be $21,500,000. <br /> <br />I <br /> <br />Within the Sand Creek basin the pro- <br />posed work would consist of two dams and <br />channel improvements along the creeks from <br />the dams to the South Platte. <br /> <br />Sand Creek Dam and Reservoir would be <br />
The URL can be used to link to this page
Your browser does not support the video tag.