My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01658
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01658
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:05:01 PM
Creation date
10/4/2006 7:00:02 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/26/2000
Description
CF Section - New Loans - Pine River Irrigation District
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />., <br />- , <br /> <br />., <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 M E M 0 RAN DUM <br />Phone, (303) 866-3441 <br />FAX: (303) 866-4474 <br /> <br />~ <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br /> <br />John Van Sciver, p.E..:71J1.5 <br />Mike Serlet, P.E., Chief 11f}_ <br />Water Supply Planning and Finance Section. <br /> <br />Bill Owens <br />Governor <br /> <br />FROM: <br /> <br />Greg E. Walcher <br />Execu live Director <br /> <br />Peter H. Evans <br />CWCB Director <br /> <br />DATE: <br /> <br />January 14, 2000 <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />SUBJECT: Agenda Item 10e, January 26-27,2000 Board Meeting <br />Pine River Irrigation District <br /> <br />-----------------------------------------------------------~-------------------------------------------- <br /> <br />Introduction <br />The Pine River Irrigation District (PRID) is applying for a $300,000 grant for planning and design <br />costs associated with a rural domestic water distribution system to be operated by the <br />Vallecito Water Company (VWC). The estimated total cost of Phase 1 of the water distribution <br />system is $11,570,000. Please see the attached project summary and map. <br /> <br />BackClround <br />The PRID, located in La Plata County, operates Vallecito Reservoir for the benefit of the District <br />landowners/shareholders by providing storage of irrigation water. PRID formed VWC as an <br />enterprise of the District to plan, construct, and operate a rural domestic water system in <br />southeast La Plata County. PRID has obtained $11,270,000 in project funding for VWC, and <br />needs only $300,000 for up-front planning and design costs. <br /> <br />Feasibility Studies <br />PRID hired Steve Harris, P.E. of Harris Water Engineers to conduct a feasibility study. The study <br />was completed January 2000 and includes an assessment of alternatives available for completion <br />of the VWC project. <br /> <br />The Pine River IrriClation District <br />PRID was formed in the 1940's in accordance with 1922 State of Colorado Irrigation District <br />Law, Article 42. There are 300 landowners/shareholders and 45,000 acres under the District. <br />PRID has the power to set annual assessments and taxes to be paid by District <br />landowners/shareholders. Assessments are collected through the Office of the County <br />Treasurer, in the same manner in which property taxes are collected. Unpaid assessments <br />become a lien on lands within the District. PRID currently levees no tax on District lands. <br /> <br />The Vallecito Water Companv <br />VWC is an enterprise of PRID, and was formed to plan, construct, and operate a rural domestic <br />water system in southeast La Plata County. VWC has no facilities or assets, other than water <br />tap pledges. <br />
The URL can be used to link to this page
Your browser does not support the video tag.