Laserfiche WebLink
<br />PROCEDURE: <br /> <br />NOTE: <br /> <br />Prior to a Board meeting, the CWCB staff will prepare for the Board's <br />consideration a summary of tl).e technical, [mancial, and institutional <br />characteristics of each proposed instream flow water right appropriation or <br />acquisition, river restoration feasibility study or construction project. <br />Each application will be reviewed for conformity with the goals and <br />objectives of the CWCB Strategic Plan. Grant applications will be <br />considered only in the following two categories: <br /> <br />. <br /> <br />1. The appropriation or acquisition of water rights for the <br />purpose of preserving or improving the natural environment <br />to a reasonable degree to mitigate the impact of an existing <br />water facility. <br />2. River restoration feasibility studies and construction projects <br />that are designed to directly mitigate or significantly <br />improve the environmental impacts of existing water <br />facilities. <br /> <br />The Board will consider and CWCB staff will evaluate and recommend to <br />the Board grant aO'plications for aooropriation or acquisition of water <br />rig:hts to be held by the Board b~sed on the following project types: <br />. Instream flow water rights that assist in the administration of <br />compact-entitled waters, or address problems relating to compact- <br />entitled waters, <br />. Instream flow water rights that facilitate the resolution of <br />federal water rights issues, and . <br />. Instream flow water rights that assist in the recovery of <br />threatened or endangered, wildlife species or the conservation of <br />existing wildlife species within riparian ecosystems. <br /> <br />The Board will consider and CWCB staff will evaluate and recommend to <br />the Board grant applications for river restoration feasibility studies and <br />construction proiects based on the following: <br />. Soundness of the project design, work plan or plan of study, <br />. The need for the proposed project, <br />. The need for financial assistance. <br />. Financial, technical, or ach,'ninistrative participation or coordination by <br />all affected local governrn~nts. <br /> <br />Recognizing that future needs and responses to those needs cannot be <br />predicted with certainty, the Colorado Water Conservation Board reserves <br />the right to recommend for funding any instream flow acquisition, river <br />restoration construction proje~t, or study that it determines would mitigate <br />the effects of an existing wate\: supply facility and furthers the purposes of <br />the Fish and Wildlife Resources Fund. <br /> <br />. <br />