Laserfiche WebLink
<br />. <br /> <br />WELDON V ALLEY DITCH DIVERSION STRUCTURE REHABILITATION <br /> <br />P:J"~ <br />.... ." '. ....-.,""" <br />".... <br />;'!! <br />-;oJ'-._ <br />. .~","' ".--' <br />~! ;'-, <br />>.-\" . <br /> <br /> <br />The Diversion Structure Control House on the South Bank of the South Platte River <br /> <br />. <br /> <br />Proiect DescriDtion <br /> <br />This $250,000 project was the re-construction of the Weldon Valley Ditch Diversion <br />Structure on the South Platte River in Weld County west of the Town of Orchard. Jack Odor <br />Engineering Services, Inc. of Fort Morgan, Colorado, completed project design. Project <br />construction commenced by Ransom Boone Construction, Inc. of Fort Morgan October 21, 1997 <br />and was completed in January 1998. Final project accounting and documentation was completed in <br />February 1998. <br /> <br />Proiect Data <br /> <br />Sponsor: Weldon Valley Ditch Company County: Weld <br /> <br />River: South Platte River <br /> <br />Terms of Loan: $181,888.64 @3.5% for 20 yrs. <br /> <br />Substantial Completion Date: Feb. 20, 1998 <br /> <br />Design Engineer: Jack Odor Engineering Services, Inc. - Fort Morgan, Colorado <br /> <br />Construction Contractor: Ransom Boone Construction, Inc. - Fort Morgan, Colorado <br /> <br />I - 5 ft high x 60 ft. long Obermeyer pneumatic spillway crest gate <br />I - 8 ft. steel radial release gate <br />Ditch Capacity = 165 cfs <br /> <br />. Annual Volume of Water Delivered by the Project: 1,000 ac.ft. <br /> <br />Design Criteria: <br />