My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01653
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01653
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:04:55 PM
Creation date
10/4/2006 6:59:56 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/10/1998
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />e <br /> <br />e <br /> <br />Ute Water Conservancv District - Plateau Creek Pineline <br /> <br />Authorization: SB 88-30 <br />Water Source: Grand Mesa Drainage <br />Terms of Loan: $7,600,000 @ 5% for 30 years <br /> <br />County: Mesa <br />Project Yield: 7,200 ac.ft. <br />Project Type: Pipeline Construction <br /> <br />This project is the replacement of an existing IS-mile pipeline providing water to the Ute <br />Water Conservancy District. The District provides water to 55,000 people, or more than half of the <br />Grand Valley population. The project is currently in the environmental analysis phase of the <br />project design. The Environmental Assessment was heavily scrutinized by the Fish and Wildlife <br />Service relative to the Recovery Implementation Program along the IS-mile reach. This analysis <br />has resulted in the Bureau of Land Management (the lead federal agency) requiring an <br />Environmental Impact Statement be prepared before federal approval can be granted. The Record <br />of Decision regarding the EIS is scheduled for March 1998, with project design to commence <br />immediately thereafter. <br />
The URL can be used to link to this page
Your browser does not support the video tag.