My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01649
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01649
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:04:54 PM
Creation date
10/4/2006 6:59:54 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/25/2002
Description
CF Section - Special Purpose Accounts Small Project Feasibility Study Grant Fund - Replacement of Funds
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />e <br /> <br />tit <br /> <br />e <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br />MEMORANDUM <br /> <br />TO: <br /> <br />Colorado Water ConselVation Board Members <br /> <br />Mike Serlet, P.E.~ <br />Chief, Water Supply Planning and Finance Section <br /> <br />FROM: <br /> <br />DATE: <br /> <br />November 15,2002 <br /> <br />SUBJECT: <br /> <br />Agenda Item #25b - November 25-26, 2002, Board Meeting <br />Water Supply Planning and Finance <br />Special Purpose Accounts <br />Small Project Feasibility Study Grant Fund - Replacement of Funds <br /> <br />Introduction <br /> <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Twelve feasibility studies with grant contracts totaling almost $100,000 have been financed <br />through the Board's Feasibility Study Small Grant Fund. Approximately one half of the original <br />balance in the Feasibility Study Small Grant Fund is currently exhausted. <br /> <br />Backl!round <br /> <br />In 1999 through SB 99-173, the Legislature authorized the Board to set aside $200,000 of <br />Construction Fund money in a special fund reselVed for feasibility studies for water resources <br />infrastructure systems projects. The money in the fund is continuously appropriated to the Board for <br />immediate availability for making small grants to water users to help pay for the costs of preparing <br />feasibility studies in conformance with the CWCB Construction Fund Guidelines. The fund is <br />intended to provide flexibility for the Board to make financial resources available in a timely manner <br />when the legislative approval process would be a significant financial hardship to a borrower. <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.