Laserfiche WebLink
<br />, <br />. Contract Status Report <br />eContracts Completed During FY97-98 <br /> <br />Borrower Project <br />1 Agricultural Ditch Co. Welch Ditch Pump & P <br />2 AGUA Feas Study - Aug prog <br />3 Buffalo Mutual Irrigation Diversion Dam Rehab <br />4 Chipperfield Lane Ditch Rehab head gate & pip <br />5 Decker Lateral Co. SPL Ditch Lining <br />6 Durkee Ditch Co. New Headgate & Pipel <br />7 Erie, Town of Amend#1 Parity <br />8 Farmers Independent Dit SPL Rehab ditch <br />9 Greeley & Loveland Irriga Feasibility Study <br />10 Hawkeye Lateral Ditch C Ditch Rehab <br />11 Horse Creek Water Users Purchase Aug. water <br />12 Lone Cabin Ditch & Res. Amend#2: Refinance <br />13 Lower Arkansas Feasibility Study <br />14 Morrison, Town of Raw Water Diversion <br />15 Pinon Mesa Ranches Diversion Structure, pi <br />16 River Oaks on Roaring F Raw Water Irrig. Syste <br />17 Sanchez Ditch & Res. Co Amend#1 Increase Lo <br />18 Smith Ditch SPL rehab ditch <br />1i. South Platte Lower River Amend Grant Contract <br />. Summit Reservoir & Irrig. Rehab Res. & Irrigatio <br />21 Upper Yampa WCD Refinance Stagecoach <br />22 Ute WCD Amend#2 Refund Bon <br />23 Weldon Valley Ditch Co. Diversion Dam Rehab <br />24 Wood Lake Mutuallrr. Co Rehab Wood Lake Da <br /> <br />Projects In Contracting Process <br /> <br />Borrower Project <br />25 AGUA Purchase water rights <br />26 Colorado River WCD Amend#2: Final Loan <br />27 CWPDA Feas Study - Aug prog <br />28 Excelsior Irrigating Co. Rehab ditch <br />29 Excelsior Irrigating Co. Amend Release Collat <br />30 Fort Lupton, City of Amend#2 <br />31 Fort Morgan, Town of Amend#2 Parity <br />32 Hudson, Town of Amend#1 <br />33 South Platte Lower River Grant <br /> <br />. <br /> <br />$ <br /> <br />Loan Amount <br />300,000 <br />25,000 <br />250,000 <br />60,000 <br />100,000 <br />120,000 <br />o <br />55,000 <br />23,400 <br />143,000 <br />825,000 <br />o <br />65,000 <br />504,000 <br />206,000 <br />16,000 <br />135,000 <br />100,000 <br />60,000 <br />600,000 <br />2,000,000 <br />o <br />188,000 <br />188,000 <br />5,963,400 <br /> <br />Date <br />Completed <br />1/20/98 <br />10/23/97 <br />10/23/97 <br />11/14/97 <br />12/2/97 <br />11/3/97 <br />1/6/98 <br />1/3/97 <br />12/8/97 <br />12/15/97 <br />12/17197 <br />12/18/97 <br />9/17197 <br />8/26/97 <br />10/9/97 <br />8/5/97 <br />9/3/97 <br />12/3/97 <br />1 0/23/97 <br />9/3/97 <br />7/17197 <br />10/23/97 <br />10/29/97 <br />12/10/97 <br /> <br />Loan Amount Construction Status <br />590,590 3/5/98 2/24 To Controller to sign <br />o 2/24 To Controller to sign <br />75,000 3/1/98 2/25 To Borrower to review <br />230,000 12/1/972/5 To Controller to sign <br />o 3/1/98 2/25 To Borrower to sign <br />o 3/1/98 11/1 drafting <br />o 3/1/98 2/5 To Borrower to review <br />o 3/1/98 11/1/ drafting <br />240,000 3/1/98 11/4 To Borrower for review <br />1,135,590 <br /> <br />$ <br /> <br />Prepared by Janis \IIian <br />Updated 3/2198 <br />