My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01640
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01640
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:04:47 PM
Creation date
10/4/2006 6:59:48 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/23/1998
Description
CF Section - Project De-Authorizations
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />721 Centennial Building <br />131 3 Sherman Street <br />Denver, Colorado 80203 <br />Phone, 0031 866.3441 <br />FAX: 13031866.4474 <br /> <br />STATE OF COLORADO <br /> <br />o <br /> <br />Roy Romer <br />Governor <br /> <br />James S. Lochhead <br />Executive Director, DNR <br />Oaries C. liJe, P.E. <br />Director, CWeB <br />Peter H. Evans <br />Acting Director, CWeB <br /> <br />MEMORANDUM <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br /> <br />William P. Stanton, P.E. ~. <br />Chief, Project Planning and Construction Section <br /> <br />FROM: <br /> <br />DATE: <br /> <br />November 16, 1998 <br /> <br />SUBJECT: Agenda Item 13, November 23-24,1998 Board Meeting- <br />Water Project Construction Loan Program - Project De-authorizations <br /> <br />Introduction <br /> <br />Staff evaluated 14 previously authorized projects for consideration by the Board for de- <br />authorization. As of the date of this memo, we have received either verbal or written <br />confirmation from 9 loan applicants, and 5 applicants indicated they have plans to use the loan <br />funds. The total amount proposed for de-authorization is currently $5.6 million. An update will <br />be provided at the November meeting. <br /> <br />Background <br /> <br />Authorized projects which show no activity may be de-authorized to allow new projects <br />to proceed, especially those that may have ::l better chance of coming to fruition. If an <br />appropriation has not been encumbered within two years after approval, the Board staff will work <br />with the project sponsor to determine if they intend to move the project forward or if it should be <br />de-authorized by the General Assembly. It has been an informal policy of the Board not to de- <br />authorize a project without written confirmation from the applicant. <br /> <br />After a construction project has been completed, any remaining unspent but still <br />encumbered funds are made available for new projects through a contract amendment process. <br />Any remaining authorized funds for a completed project are made available for new projects <br />through a formal request to the DNR Accounting Section. <br />
The URL can be used to link to this page
Your browser does not support the video tag.