Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />.. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />DRAFT 9-1-04 <br />B. Modification of Interest to be Conveved. The parties recognize that the interests <br />in the storage space in the Reservoir Enlargement and the water rights to be conveyed to <br />the CWCB, pursuant to paragraph II.A. herein may be modified by letter agreement <br />between the parties and the CWCB if one of the following events occurs: <br /> <br />1. Elevation-Area Caoacitv Curve. If the River District's as-built <br />elevation-area capacity curve table of the Reservoir Enlargement shows the <br />enlargement area to be less than 11,750 acre-feet, then the Recovery Program <br />through the CWCB and Reclamation, in consultation with the Service may, in <br />their discretion: <br /> <br />a. agree to accept the conveyance to the CWCB ofa 20/47ths <br />interest in the capacity created by the Reservoir Enlargement as shown on <br />the as-built elevation-area capacity curve; in such case the storage <br />capacity and water right interests to be conveyed pursuant to paragraph <br />H.A. herein shall be adjusted accordingly; or <br /> <br />b. accept agree to the conveyance to the CWCB ofthe <br />storage space and water right interests described in paragraph H.A. herein, <br />but agree to adjust the Recovery Program Obligation and pay a percentage <br />share of the Reservoir Enlargement Cost of Construction equal to the <br />percentage of: 5,000 acre feet divided by the number of acre feet of <br />storage space created by the construction of the Reservoir Enlargement as <br />determined by the as-built elevation-area capacity curve. <br /> <br />2. Cost Overruns. If the actual Reservoir Enlargement Cost of <br />Construction exceeds $20,498,787.00, then the Recovery Program through the <br />CWCB and Reclamation, in consultation with the Service may, in their discretion: <br /> <br />a. choose not to pay more than the Recovery Program <br />Obligation, but agree to accept the conveyance to the CWCB of adjusted <br />storage space and water right interests in an amount equal to 11,750 acre <br />feet multiplied by (the Recovery Program Obligation divided by the actual <br />Reservoir Enlargement Cost of Construction); or <br /> <br />b. agree to accept the conveyance to the CWCB of the <br />storage space and water right interests described in paragraph H.A. herein, <br />but agree to adjust the Recovery Program Obligation and pay 20/47ths of <br />the .actual Reservoir Enlargement Cost of Construction. <br /> <br />3. Nonoavment. In the event that one of the events described in <br />paragraph 11.B.1. or H.B.2. herein occurs, the Recovery Program through <br />Reclamation, the Service and/or the State of Colorado shall commit to pay a full <br />Pro-Rata share to the River District (as described in paragraphs H.B.1.a. or <br /> <br />C:\Documents and Settings\amj.DWR\Local Settings\Temporary Interne~~oir Enlargement Agreement ~~1-04 clean-doc <br />