My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01632
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01632
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:04:42 PM
Creation date
10/4/2006 6:59:35 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/13/2004
Description
ISF Section - Proposed Water Right Acquisition - Elkhead Reservoir Enlargement
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Seplembu2,2004Page 10 of 16 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />B. The water rights conveyed pursuant to paragraph II.A.2. herein to the CWCB for the <br />purpose of filling the water storage space easement shall have the same priority as those <br />water rights used by the River District to fill the River District's water storage space in <br />the Reservoir Enlargement. Fill of the water storage space easement granted to the <br />CWCB shall be done on a Pro-Rata basis with the fill of the River District's water storage <br />space in the Reservoir Enlargement. The parties acknowledge that the Yampa <br />Participants and the City of Craig own water storage rights decreed for use at the existing <br />Elkhead Reservoir that are senior to the water rights that will be adjudicated by the River <br />District and conveyed to the CWCB in paragraph II.A.2. herein, The parties <br />acknowledge that the River District's and CWCB's right to store water in the Reservoir <br />Enlargement is subject to the water rights and priorities owned by the Yampa <br />Participants, the City of Craig, and their successors and/or assigns. <br /> <br />C. The River District agrees that the CWCB shall carry over for use in the next succeeding <br />year any Permanent Water Supply water that was stored but not actually scheduled for <br />release by the Service for beneficial use by the CWCB in the previous year. Any water <br />remaining in the CWCB' s storage pool for the Permanent Water Supply at the start of fill <br />date established by the Restated and Amended Agreement between the Yampa <br />Participants, the City of Craig and the River District, after subtracting for the past-year's <br />releases, evaporation, and sedimentation, shall be credited to the CWCB's Permanent <br />Water Supply storage pool. The CWCB may not carry over more than 5,000 acre-feet of <br />Permanent Water Supply water in the Reservoir Enlargement at any time. <br /> <br />D. The parties hereto shall meet annually and/or teleconference as needed to consult on <br />schedules for releasing the Permanent Water Supply from the Reservoir to provide water <br />during critical low-flow periods in the Yampa River Basin. The Service shall provide the <br />parties hereto a preliminary written schedule of anticipated monthly demands on or <br />before May 1 of each year. Following such consultations, the schedule provided by the <br />Service (which shall make the final decisions regarding this schedule) shall serve as the <br />release schedule to be used by the River District until the Service provides written notice <br />of the schedule's modification. The Service may modify its schedule for releasing the <br />Permanent Water Supply from the Reservoir Enlargement by providing the CWCB, the <br />River District and the Division 6 Engineer with a written change order at least 24 hours in <br />advance of such modification. For the purposes of this paragraph, written notice may <br />consist of either electronic (email) or facsimile transmissions in lieu of correspondence <br />through the U.S. Postal Service. <br /> <br />E. Deliveries of water from the Permanent Water Supply shall occur at the outlet of the <br />Elkhead Reservoir Enlargement. The River District shall have no responsibility once <br />water stored in the Reservoir Enlargement by the CWCB is released at the outlet. The <br />Division 6 Engineer may assess appropriate transit losses against the release of water <br />stored in the Reservoir Enlargement pursuant to the interests granted in paragraph II.A.2. <br />herein. <br /> <br />C:\Docwnents and Settings\amj.DWR\Local Settings\Temporary Internet Filcs\OLKF9\Acq'n Agmt 9-1-04 clean.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.