My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01622
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01622
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:04:34 PM
Creation date
10/4/2006 6:59:29 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/10/1998
Description
CF Section - List of Standard Contract Provisions
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. .'~.' <br /> <br />) <br /> <br />I" <br /> <br />1. Construction Fund Program Procedures. The following items are procedures the BORROWER <br />shall follow during the construction phase of the PROJECT. <br /> <br />a. The BORROWER shall employ an engineer, registered in the State of Colorado, hereinafter <br />referred to as the CONSULTANT, to prepare plans and specifications for the PROJECT. <br /> <br />b. The agreement between the BORROWER and the CONSULTANT and the plans and specifications <br />must be submitted to the CWCB staff for verification of compliance with the terms of this contract <br />prior to bid opening. Any modifications to the plans and specifications must be approved in <br />writing by the CWCB staff. <br /> <br />c. For plans and specifications for all jurisdictional dams and reservoirs, as defined by ~ 37-87-105 <br />C.R.S. (1997), the BORROWER shall provide a letter of approval from the State Engineer's Office <br />prior to construction. <br /> <br />d. CWCB staff must be present at bid opening and must approve the award of the construction <br />contract. <br /> <br />. <br /> <br />e. The BORROWER shall contract for the construction of the work with responsible and capable <br />firms, hereinafter referred to as CONSTRUCTION FIRMS, which CONSTRUCTION FIRMS shall be <br />selected by the BORROWER and found acceptable by the CWCB staff before work under this <br />contract begins. <br /> <br />f. The BORROWER must provide a copy of the executed construction contract documents consisting <br />of the advertisement for bid, contractor's proposal, construction contract, bid bond, performance <br />bond, payment bond, notice of award, notice to proceed, sample Change order, and sample field <br />order. After the CWCB staff verifies that these documents comply with the terms of this contract, <br />the BORROWER may issue the notice to proceed to the CONSTRUCTION FIRMS. . <br /> <br />g. The BORROWER shall conduct a pre-construction conference at which time the CWCB staff shall <br />have the opportunity to review and approve the construction schedule. <br /> <br />h. If the CWCB staff determines that the PROJECT requires a resident inspector during construction, <br />the BORROWER shall employ an inspector who has been approved by the CWCB staff. <br /> <br />i. The BORROWER shall construct the PROJECT in accordance with the approved plans and <br />specifications. <br /> <br />j. Upon completion of the PROJECT construction, the BORROWER shall provide as-built drawings of <br />the PROJECT to the CWCB staff, and, if required by ~ 37-87-105, C.R.S. (1997), the BORROWER <br />shall provide the same drawings to the State Engineer's Office for approval and filing. <br /> <br />k. Upon completion of the PROJECT construction, the BORROWER shall arrange a final inspection for <br />the CWCB staff, CONSTRUCTION FIRM, and the CONSULTANT. <br /> <br />2. Time For PROJECT Completion. The BORROWER recognizes that time is of the essence in the <br />performance of all of its obligations under this contract. Therefore, the BORROWER shall complete <br />the PROJECT within two (2) years from the date of this contract. The time for completion of the <br />PROJECT may be extended subject to the approval of the STATE. The BORROWER must provide, in <br />writing, documented justification for any request for extension sixty (60) days prior to the end of the <br />period for completion. <br /> <br />3. Indemnification By The CONSTRUCTION FIRM. The BO~ROWER shall require all CONSTRUCTION .' <br />FIRMS and their subcontractors to indemnify the STATE and the BORROWER against all liability and <br /> <br />Page 2 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.