Laserfiche WebLink
<br />\, <br /> <br />211 <br /> <br />, <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />STATE OF COLORADO <br /> <br />a <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 ShermAn Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (3031 866.3441 <br />FAX: (3031866.4474 <br />www.C.Wcb.state.co.us <br /> <br />BiJlOwens <br />Governor <br /> <br />MEMORANDUM <br /> <br />GregE.Willchl!r <br />becutive Director <br /> <br />Rod Kuharich <br />(WeB Dir~ctor <br /> <br />Dal) McAuliffe <br />Deputy Direclor <br /> <br />TO: <br /> <br />Colorado Water Gonservation Board Members <br /> <br />John Van Sciver, P.E. -.:JVS <br />Mike Serlet, P.E., Chief \It..\. <br />Water Supply Planning a~\lJnance Section. <br /> <br />FROM: <br /> <br />DATE: January 11, 2001 <br /> <br />SUBJECT: Agenda Item 11d., January 24-25,2001 Board Meeting <br />Kenosha Trout Club (Homeowners Association.) <br /> <br />Introduction <br />The Kenosha Trout Club (KTC) is applying for a loan in amount of $600,000 to purchase <br />water for augmentation and to rehabilitate the dam on Lininger Lake. The estimated cost <br />to purchase the needed water rights (including engineering and legal costs), and to <br />rehabilitate the dam, is $800,000. Please see the attached project summary and map. <br /> <br />Backaround <br />The KTC, located in Park County, represents property owners within the Kenosha Trout <br />Club subdivision. The KTC operates and manages community property, including all water <br />rights, lakes, and roads. The community lake (Lininger Lake) is used primarily for fishing <br />and recreation, and is filled through a junior water right off Beaver Creek. The State <br />Engineer's Office recently started strictly administering the water right that fills the lake, <br />and is requiring the KTC to acquire augmentation water to make up for evaporation losses <br />from the lake surface, or to curtail diversions during the summer months. The KTC wants <br />to buy water rights for augmentation so that the lake remains full the majority of the <br />summertime. As a part of the project, the KTC plans to make improvements to the dam in <br />accordance with State Engineer requirements. <br /> <br />(Note: CWCS Polley #8 allows loans solely for the purchase of water rights, if the <br />purchase satIsfies an existing need or shortage. A written appraisal or opinion of <br />value supporting the purchase price Is required.) <br /> <br />Feasibility Studies <br />Greg Roush, P.E., of Leonard Rice Consulting Water Engineers, Inc. has completed the <br />feasibility study. The study includes an assessment of alternatives available to provide <br />augmentation water and make improvements to the dam. <br /> <br />Flood Protection. Water Project PI<lnning and Financing. Stream and lake Protection <br />Water Supply Protection. Conserv.ltion Planning <br />