My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01609
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01609
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:04:23 PM
Creation date
10/4/2006 6:59:11 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/21/1998
Description
WSP Section - Rio Grande Basin Issues - Rio Grande Decision Support System (RGDSS) - Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />721 Centennial Building <br />, 313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br /> <br />STATE OF COLORADO <br /> <br />~ <br /> <br />Roy Romer <br />Governor <br /> <br />MEMORANDUM <br /> <br />James S. Lochhead <br />Executive Director, DNR <br />DariesC. Lile,P.E. <br />Director, eWeB <br />Peter H. Evans <br />Acting Director, eweB <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br /> <br />FROM: Randy Seaholm ~ <br />Andy Moore <br />Interstate Streams and Hydrologic Investigations Section <br /> <br />DATE: September 10, 1998 <br /> <br />SUBJECT: Agenda Item 18b. September 21-22,1998, Board Meeting- <br />Rio Grande Decision Support System (RGDSS) - Status Report <br /> <br />Actions taken since the July 13-14, 1998, Board Meeting, as well as the schedule for the near <br />future, include the following: <br /> <br />July 27 <br /> <br />Selected top three SOQ' s in each of the five contract areas: ground water, <br />surface water, consumptive use/water budget, system integration, and project <br />management assistant. <br /> <br />August 12-13 The top three applicants for each contract area were interviewed. <br /> <br />August 24 <br /> <br />Finalized consultant selection (See table below) for each contract area. System <br />integration contract was broken into two pieces so two applicants with strengths <br />in (jjfferent areas could both be part of the team. <br /> <br />September <br /> <br />Initiate contract negotiations and finalize scopes of work with selected <br />consultants. The Advisory Committee will be allowed two weeks to review the <br />scopes of work prior to finalizing them. <br /> <br />October/ <br />November <br /> <br />Begin working on RGDSS. <br /> <br /> <br />RGDSS PROJECT TEAM <br />Contractor <br />HRS <br />H dros here <br />Leonard Rice/ A <br />RTi and HDR <br />HDR <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.