Laserfiche WebLink
<br />. <br /> <br />Table 3 is a summary a~the financial aspects .of the praject. Annual assessments wauld increase _ <br />fram $21 up ta $29 per share WIth a CWCB laan payment af$19,840 (including the 10% reserve <br />requirement.) This $8 assessment increase represents .only $2.48 per acre-faot annuallaan cast, based an <br />average annual diversians .of 8,000 acre-feet. <br /> <br />Table 3. Financial Summary <br /> <br />Pra' ect Cast <br />Laan Amaunt 75% afPra'ect Cast) <br />CWCB Loan Pa ent Amaunt, includin 10% laan reserve <br />Number .of Sharehalders <br />Number .of Shares .of Stack <br />Current Assessment er Share <br />Future Assessment er Share <br />Annual Laan Cast per acre-faat <br />(Average annual diversians: 8,000 acre-feet) <br /> <br />$503,329 <br />$377,497 <br />$19,840 <br />7 <br />1000 <br />$21 <br />$29 <br />$2.48 <br /> <br />Credit wo.rthiness: The East Fark Mutual Irrigatian Camp any has an appraved laan with CWCB in the <br />amaunt .of $257,287. Ta-date the Campanyhas withdrawn $79,716 afthase available funds. Table 4 <br />shaws the Campany's Financial Ratias and indicates, with the exceptian .of Cash Reserves, average ta <br />strong ability ta repay with the prapased laan increase. <br /> <br />e <br /> <br />Table 4. Financial Ratios <br /> <br />Financial Ratio. With With <br /> Current pro;ect Amended pro.iect <br />Operating Ratia (revenue/expense) 106% 104% <br />weak: less than 100% (average) (average) <br />average: 100% - 120% <br />strang: greater than 120% <br />Debt Service Caverage Ratia 110% 106% <br />(revenues-expenses)/debt service (average) (average) <br />weak: less than 100% <br />average: 100% - 125% <br />strang: greater than 125% <br />Cash Reserves ta Current Expense 15% 12% <br />weak: less than 50% (weak) (weak) <br />average: 50% - 100% <br />strang: greater than 100% <br />Annual Cast per Ac-Ft diverted (8,000 ac-ft) $2.62 $3.61 <br />weak: greater than $20 (strang) (strang) <br />average: $10 - $20 <br />strang: less than $10 <br /> <br />e <br /> <br />4 <br />Flood Protection. Water Project Planning and Financing. Stream and I...a1<e Protection <br />Water Supply Protection. Conservation Planning <br />