My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01595
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01595
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:04:18 PM
Creation date
10/4/2006 6:59:05 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/22/2005
Description
CF Section - Request for Funds from the Feasibility Study Small Grant Fund - Orchard Mesa Irrigation District
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />... <br /> <br />'f <br /> <br />e <br /> <br />e <br /> <br />e <br /> <br />Orchard Mesa Irrigation District <br />March 15, 2005 <br />Page 2 of 2 <br /> <br />Agenda Item XXx <br /> <br />. Another significant concern is the deteriorated condition of the Stokes Gulch Siphon. The <br />siphon needs to be repaired or replaced, since major property damage downstream 'of the siphon <br />would occur if the siphon were to fai1. <br /> <br />The preliminary cost estimate for the Power Canal Rehabilitation Project is $2.5 million. It is' <br />the District's intention to utilize the feasibility study to develop a consensus among the landowners <br />for the improvements and authorize a CWCB loan request. The District hopes to commence the <br />project in the fall of2005. <br /> <br />Discussion <br /> <br />The Scope of Work for this study addresses the technical aspects of the project. The study <br />should be expanded to include economic and financial evaluation of the project so that it would form <br />the basis for a future CWCB loan. <br /> <br />The Feasibility Study Small Grant Fund (CRS 37-60-122.7) is a source of immediate funding <br />for studies that wi11 likely develop into raw water projects financed by a CWCB loan. Financial <br />Policy #17 provides that all grants from the fund wi11 be limited to 50 percent of the total study cost. <br /> <br />Recommendation <br /> <br />Staff recommends the Board approve non-reimbursable funding from the Feasibility Study <br />Small Grant Fund to the Orchard Mesa Irrigation District to conduct a Feasibility Study evaluating <br />the rehabilitation of the District's power canal and Stokes Gulch Siphon, for an amount not tp exceed <br />$15,000, or up to 50% of the total study cost, <br />
The URL can be used to link to this page
Your browser does not support the video tag.