My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01591
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01591
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:04:11 PM
Creation date
10/4/2006 6:58:48 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/22/1987
Description
CWCB Meeting
Board Meetings - Doc Type
Meeting
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />Draft <br />1/22-23/87 <br /> <br />Colorado Water Conservation Board <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br /> <br />Beaver Park Water Project <br />(Beaver Park Water, Inc.) <br /> <br />Introduction <br /> <br />Beaver Park Water, Inc., has submitted a request for <br />matching funds to continue upgrading its irrigation water <br />distribution system. The proposed project would upgrade and <br />rehabilitate the lowermost part of the company's ditch and <br />pipeline system, the upper part having already been improved <br />through a previously authorized CWCB project. <br /> <br />Problem <br /> <br />The lowermost part of the company's irrigation system <br />experiences serious losses in its dirt ditches and old <br />pipelines. These problems cause water shortages during peak <br />demand periods. <br /> <br />Feasibility Study <br /> <br />A feasibility study for the improvement of the overall <br />Beaver Park Water, Inc" system was completed 'in 1979 for the <br />CWCB. Subsequently, the U.S. Soil Conservation Service also <br />conducted a soil and water conservation plan for the area. <br />These studies are the basis for the recommendation on this <br />project <br /> <br />Proposed Proiect <br /> <br />This project would install concrete lining in approximately <br />one mile of the company's lower canal system and install a <br />total of 9,600 lineal feet of various sizes and types of pipe <br />laterals. The project would enable some previously irrigated <br />lands to be put back under irrigation. The estimated cost of <br />the project is $250,000, <br /> <br />2318E <br />
The URL can be used to link to this page
Your browser does not support the video tag.