My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01586
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01586
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:03:40 PM
Creation date
10/4/2006 6:58:24 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/25/2002
Description
CF Section - New Loans - Central Weld County Water District - Proposed Dry Creek Reservoir
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,. <br /> <br />" <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Central Weld County Water District - Proposed Dry Creek Reservoir <br />November 25-26, 2002 <br /> <br />Agenda Item 20g <br /> <br />Alternative No. 1 - The no action alternative does not provide raw water storage for the Districts, <br />leaving them vulnerable to service interruptions caused by limited supply from Carter Lake, as well <br />as the high cost of obtaining supplemental water from other entities. For 2003, L TWD has <br />budgeted $500,000 for rental water to meet the needs of its customers, and CWCWD has budgeted <br />$1,000,000 for rental water. Additionally, it is expected that the Northern Colorado Water <br />Conservancy District carry-over policy will be limited or discontinued in the near future, leaving the <br />Districts vulnerable to annual climate fluctuations and water yield quota fluctuations. <br /> <br />Alternative No.2 - This alternative consists of constructing a reservoir, including an earthen dam <br />and water delivery system, at the location 2-3 miles southeast of Carter Lake. The dam would <br />impound up to 5200 ac-ft of water for use by the Carter Lake Filter Plant. An existing 20-inch steel <br />pipeline would be used to transport water between the filter plant and the reservoir, and a new <br />pumping facility would be constructed to deliver water from the reservoir. <br /> <br />Alternative No.3 - This alternative consists of constructing a dam, closer to the Filter Plant, at the <br />location about 0.5 miles to the northeast. The dam would impound approximately 800 ac-ft of <br />water. This alternative was ruled out following preliminary geological, geotechnical, and <br />environmental evaluation due to considerable geological complications and environmental issues. <br />The combination of small storage capacity and high .cost also made this alternative unfeasible. <br /> <br />The selected alternative. Alternative No. 2 - Alternative 2 was selected because it is the most <br />feasible alternative for meeting the Districts' need for raw water storage. It would consist of the <br />following: <br /> <br />1. Construction of an approximately 5200 acre-foot reservoir including a 40-foot high earthen <br />dam with emergency spillway and outlet works. <br /> <br />2. Conversion of an existing 20-inch treated water line to a raw water line to connect the <br />reservoir to the Carter Lake Filter Plant. <br /> <br />3. Construction of a 5000 GPM pump station to pump water from the reservoir to Carter Lake <br />Filter Plant. <br /> <br />Smith Geotechnical Engineering Consultants has conducted feasibility-level design work for the <br />proposed dam, and TEC Engineering has conducted feasibility-level design work for the proposed <br />pump station. Geotechnical investigation, testing, and analysis indicates that the site is suitable for <br />the construction of the proposed reservoir. A geologic assessment indicates no geologic conditions <br />or other physical features that would complicate the construction of a dam. A spillway of <br />approximately 350 feet will be provided. The outlet works would consist of a 48-inch diameter outlet <br />pipe, constructed with a gate on the upstream end for control of the outlet and a gate tower within <br />the dam to facilitate operation and maintenance. <br /> <br />Total Project cost (including contingency and inflation) is estimated to be: <br /> <br />1. <br />2. <br />3. <br /> <br />Engineering Fees <br />Land Acquisition <br />Construction Cost <br /> <br />$ 805,000 <br />$2,750,000 <br />$6.945.000 <br />$10,500,000 <br /> <br />TOTAL <br /> <br />Schedule . If the loan is approved, project construction would begin in Fall 2004. <br /> <br />Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.