My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01583
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01583
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:03:27 PM
Creation date
10/4/2006 6:58:08 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/21/1998
Description
WSP Section - Colorado River Basin Issues - Glen Canyon Dam Adaptive Management Program
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. Approved a Proposal by the Bureau of Reclamation to postpone the permanent <br />installation of 4.5 ft. spillway gate extensions on Glen Canyon Dam. The gate a <br />extensions were required by the FEIS and the ROD and were to provide additional ., <br />storage space for reducing the frequency of uncontrolled spills from Lake Powell. <br />Recent scientific and operational studies indicate that the additional storage space is <br />not needed. <br /> <br />. Approved the FY 2000 budget for the Grand Canyon Monitoring and Research <br />Center. <br /> <br />. Approved a plan for research and monitoring the operational impacts of Glen Canyon <br />Dam on Lake Powell and resources downstream from the Dam. <br /> <br />The next meeting of the AMWG will be held in January 1999 in Phoenix. We will keep you <br />informed on future activities of the Adaptive Management Program. <br /> <br />GJ/par/1/boardlsept98/item20m#2 <br /> <br />~ <br /> <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.