My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01568
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01568
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:03:19 PM
Creation date
10/4/2006 6:57:49 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/19/2003
Description
Agenda
Board Meetings - Doc Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />discuss settlement parameters with its coOunsel. Staff is authorized toO settle any <br />litigation without Board ratification i( the settlement tenns are consistent with <br />instructions given by the Board to its counsel. <br /> <br />8k. Public Review Process. The Board shall follow the public review process in Rules <br />11a. . 11c. prior to consideration ofa request to ratifY a pretrial reselution pursuant to <br />Rule 8i.(3). <br /> <br />81. Notice. At any time Staff verifies that an ISF water right is not being fulfilled as a <br />result of water use against which the I$F water right is entitled toO protection, the <br />Staff shall provide Proper Notice, including a de:scription of what the Board is doing <br />in response to the situation. <br /> <br />9. MODIFICATION OF ISF RIGHTS. The Board may modifY any existing decreed ISF <br />right according to the procedures set forth in this Rule. "MoOdification" of an ISF right within <br />the meaning ef this Rule includes a decrease in the rate .of flow described in the existing ISF <br />decree, segmenting an existing ISF reach intoO shorter reaches with the result of decreasing <br />the rate of flow in any portioOn of an ISF reach, ~r subtracting water from an ISF right during <br />any particular time period or season. : <br /> <br />9a. Need for Modification, Medificatien may be requested by the Staff or by any persen <br />whe has filed a water right applicatien on an ISF reach er who has applied fer any <br />governmental pennit for facilities loOcated in or near an ISF reach and who complies <br />with Rules 9b. and 9c. Any request for modification, except by staff, shall be made in <br />writing, submitted to Staff and such writing shall contain the following infonnation: <br /> <br />(1) name, address and telephone number of the person seeking modificatien; <br /> <br />(2) stream or lake subject of request; . <br /> <br />(3) modificatien requested; <br /> <br />(4) reasen for modification; and <br /> <br />(5) the scientific data supporting the request. <br /> <br />9b. Need for Water. Any person who reque~ts a modification of an ISF right must, as a <br />precondition to the Beard's censideration of the request, establish a need for the <br />water made available by the modification" Staff' does not have to comply with this <br />rule and any governmental entity seeking to implement the terms of an agreement <br />specified in Rule 9f. does not have to comply witl1 this section. <br /> <br />9c. Grounds for Modification. No request for modilication may be considered until the <br />applicant establishes that one of the foll~wing reslsons fer modification exists: <br /> <br />21 <br /> <br />1- <br />
The URL can be used to link to this page
Your browser does not support the video tag.