Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />~ <br /> <br />distribu:ed dUrin~ 1997-1998. They include: (1) a Value Planning Study which screened <br />altematives available to control temperatures; (2) a Feasibility Study which evaluated the cost of <br />fIVe altematives for temperature controls, and (3) an evaluation of aquatic food resources <br />completed in Odober 1997, 'Benthic Ecology of the Colorado River System Through the <br />Colorado Plateau Region of the Southwestern United States,' which includes an evaluation of <br />warmer water on Gamman.J~. <br /> <br />An experimental design for modifying the penstock intakes was developed, with an estimated <br />cost of $15 milJion. A draft environmental aSSessment (EA) was completed for TWG Review on <br />June 22, 1998. The public draft EA was distributed In early Janua;y 1999 fer a Sa-day review <br />period. Based on requests by members of the AMWG. a peer review panel will be assembled <br />beginning in March 1999 to evaluate the information presented in the draft EA. <br /> <br />STATUS OF ELEMENT 1.B. <br />ONGOING. Funding has been programmed to continue worldng toward a decision regarding a <br />temperature control device (selective withdrawal.) Actions to complete this item have been <br />accelerated. and it is several years ahead of the schedule originally presented. Based on the <br />EA, Redamation, in consultation with the Servies and other members of the AMWG, will decide <br />to either pursue constnJctlon and testing of the structure (assuming there is a finding of no <br />significant impad projeded for construction and testing), initiate further investigations which <br />could involve proceeding to an environmental impact statement (assuming there are potential <br />signifi~nt impacts as~ated with construction and testing), or take no action (assuming there is <br />a finding of significant impacts projected for construction and testing with no known acceptable <br />avoidance or mitigation.) <br /> <br />ELEMENT i.C. <br />D..:"rmine responses of native fishes in Grand Canyon to various temperature regimes and river <br />flows of the experimental flows and other operations of Glen Canyon Dam. <br /> <br />PROGRESS ELEMENT i.C. <br />The contracts for certain fish studies, which were on-goil'1g upon completion of the EIS. were <br />renewed to preserve a long term data base, avoiding gaps in the data. Research was conducted <br />during the 1996 experimental BHSF as well. Future research, and long term monitoring, will be <br />c"nducted t.~rc'.Jsh the GCMRC, in coordination with the TWG. Both Redamation and the <br />Service are represented on the TWG. <br /> <br />STATUS OF ELEMENT i.C. <br />ONGOING: The GCMRC staff has developed long term and annual research and monitoring <br />plans, worlting closely with Reclamation and the Service through the TWG. It is during this <br />process that specific research and monitoring needs identified by the Service in the biological <br />opinion, or subsequently identified by the Service's TWG/AMWG members, are identified and <br />incorporated for review and approval by the AMoNG. Funds have been budgeted to complete the <br />work. <br /> <br />4 <br />