My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01560
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01560
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:03:13 PM
Creation date
10/4/2006 6:57:42 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/11/1998
Description
OWC Section - Preliminary Report on Program Accomplishments, Benefits, and Challenges
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />= <br /> <br />. <br /> <br />., <br /> <br />- <br /> <br />. <br /> <br />Industrial users divert and consume a small percent of the water used in Colorado. By <br />modernizing equipment and production methods these users could reduce their consumption <br />and/or diversion rates. Generally, they do so as a business decision spurred by several <br />market factors. Typical industrial uses are junior to agricultural rights and must purchase <br />existing rights to create firm supplies. To keep water purchase costs low, processes are <br />designed with conservation in mind. Additionally, industrial and municipal r.etum flows are <br />subject to stringent permitting requirements under the Clean Water Act. To reduce <br />investment in expensive waste water treatment facilities, production processes are designed <br />and updated to minimize the amount of waste water produced. Still in a particular situation <br />the same arguments advanced in favor of an irrigation salvage or saved water right could <br />apply to older industrial plants. <br /> <br />.".. ~ <br /> <br />9 <br /> <br />53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.