Laserfiche WebLink
<br />Page ZlZ <br /> <br />S.B. <br />(Cont. ) <br /> <br />GW <br />im'blfory <br />In <br />u!(;4..!..e1/"l <br />&/0. <br /> <br />nOf,1 juf, <br />Slut <br />of <br />f,'d. <br />.Iv,fell,,,;, <br />r <br />-".tw:fa'~1f: <br />-h~ <br /> <br />. <br />V"'- <br />{':olD. I\, <br /> <br />jl,r <br />{1'11U~ <br />'II ,..tej.. <br />f ''Lv- I p. <br />. 'f .. .:t. t1 <br />/1:&1" (. <br />~. i.. 4,.- <br />L1J.( -. <br />c-/,.... , <br />if) .?K <br />r I) f(ol.K C. <br />P(<)Ut" <br /> <br />') ') 1f".L <br />( '/ [fiA/~" <br />"Pt,-,Itc.r <br /> <br />Senate JOurn""8th Day-February 7, 1989 <br /> <br />. <br /> <br />85 enter into a binding agreement with the Secretary of the <br />United States department of the interior to contribute. on a <br />oon-re,mbursable basis, one-third of the costs of construction <br />of the federal closed basin project in excess of seventy-five <br />million dollars ($75,000,000) or six million oollars <br />(S6,000.000), whichever is less, said sum to be exoended from <br />such moneys a5 are, or may hereafter become, available to the <br />Colorado water conservation board construction fund. <br /> <br />1 <br />Z <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />II <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />Zl <br />22 <br />.23 <br />24 <br />25 <br />26 <br />27 <br />Z8 <br />29 <br />30 <br />31 <br />32 <br />33 <br />34 <br />,. <br />", <br />36 <br />37 <br />38 <br />39 <br />40 <br />41 <br />42 <br />43 <br />u <br />45 <br />46 <br />47 <br />48 <br />49 <br />50 <br /> <br />SECTION 3. Studv authorization. Pursuant to section <br />37-60-115 (3), Colorado Revised Statutes, the Colorado water <br />conservation board is hereby authorized to mak.e, from such <br />moneys as are, or may hereafter become, available to the <br />Colorado water conservation board construction fund, an <br />inventory of all available geohydrologic data of bedrock <br />aquifers in Colorado west of the continental divide at a cost <br />to the board not to exceed -thirty-seven thousand five hundred <br />dollars ($37,500), provided that such casts are matched <br />eQually by other agencies, entities'- or persons. <br /> <br />SECTION 4. Study authorization. (1) The Colorado water <br />conservation board is hereby authorized to make, from such <br />moneys as are, or may hereafter become, availabie to the <br />Colorado water conservation board construction func, a <br />feaSibility study of fish culture techniQues and of fish <br />hatchery construction and operation for the propagation in <br />Colorado of threatened and endangered fish of the upper <br />Colorado river basin at a cost to the board of not more than <br />three hundred thousand dollars ($300,000). <br /> <br />(Z) There is hereby appropriated to the Colorado water <br />conservation board construction fund from the wildlife cash <br />fund the sum of one hundred fifty thousand dollars (S150,OOO) <br />. 0 cover half the cost of such feasibility study uoon the <br />enactment of House Bill No. 1187 by the general assembly in <br />the 1989 regular session, which bill contains. provision <br />authorizing the use of wildlife cash fund money far nongame <br />programs. <br /> <br />(3) In the event House 6il1 No. 1187 in not enacted, the <br />Colorado water conservation board is authorized to make the <br />feaSibility study authorized by subsection (1) of this section <br />using the full amount of the three hundred thousand oollars <br />($300,000) from such moneys as are, or may hereafter aecome, <br />available to the Colorado water conservation board <br />construction fund. <br /> <br />SECTION 5. Section 1 (1) of chapter 32, Session Laws of <br />Colorado 1987, is amended to read: <br /> <br />Section 1. Project authorizations. (I} Pursuant to <br />section 37-60-1Z2 (1) (b), Coloraoo Revised Statutes, the <br />Colorado water conservation board is hereby authorized to ioan <br />moneys to enable the construction of the following water <br />resources projects: <br /> <br />:::,l, <br /> <br />52 <br />53 <br />54 <br />,- <br />-, <br />S6 <br />57 <br />58 <br />59 <br />60 <br />61 <br />62 <br />63 <br />64 <br />65 <br />68 <br /> <br /> Repayment <br /> Project 80ard Period iota 1 <br />~riority ~ Cost (Years) ReDavmen~ <br />1 Comanche $ .862, 500 2S S 1. 529,850 <br /> Dam <br />2 P~te!"'son <br /> Dam 360,000 ZS 674.025 <br /> <br />'0 <br />0' <br />