<br />Page ZlZ
<br />
<br />S.B.
<br />(Cont. )
<br />
<br />GW
<br />im'blfory
<br />In
<br />u!(;4..!..e1/"l
<br />&/0.
<br />
<br />nOf,1 juf,
<br />Slut
<br />of
<br />f,'d.
<br />.Iv,fell,,,;,
<br />r
<br />-".tw:fa'~1f:
<br />-h~
<br />
<br />.
<br />V"'-
<br />{':olD. I\,
<br />
<br />jl,r
<br />{1'11U~
<br />'II ,..tej..
<br />f ''Lv- I p.
<br />. 'f .. .:t. t1
<br />/1:&1" (.
<br />~. i.. 4,.-
<br />L1J.( -.
<br />c-/,.... ,
<br />if) .?K
<br />r I) f(ol.K C.
<br />P(<)Ut"
<br />
<br />') ') 1f".L
<br />( '/ [fiA/~"
<br />"Pt,-,Itc.r
<br />
<br />Senate JOurn""8th Day-February 7, 1989
<br />
<br />.
<br />
<br />85 enter into a binding agreement with the Secretary of the
<br />United States department of the interior to contribute. on a
<br />oon-re,mbursable basis, one-third of the costs of construction
<br />of the federal closed basin project in excess of seventy-five
<br />million dollars ($75,000,000) or six million oollars
<br />(S6,000.000), whichever is less, said sum to be exoended from
<br />such moneys a5 are, or may hereafter become, available to the
<br />Colorado water conservation board construction fund.
<br />
<br />1
<br />Z
<br />3
<br />4
<br />5
<br />6
<br />7
<br />8
<br />9
<br />10
<br />II
<br />12
<br />13
<br />14
<br />15
<br />16
<br />17
<br />18
<br />19
<br />20
<br />Zl
<br />22
<br />.23
<br />24
<br />25
<br />26
<br />27
<br />Z8
<br />29
<br />30
<br />31
<br />32
<br />33
<br />34
<br />,.
<br />",
<br />36
<br />37
<br />38
<br />39
<br />40
<br />41
<br />42
<br />43
<br />u
<br />45
<br />46
<br />47
<br />48
<br />49
<br />50
<br />
<br />SECTION 3. Studv authorization. Pursuant to section
<br />37-60-115 (3), Colorado Revised Statutes, the Colorado water
<br />conservation board is hereby authorized to mak.e, from such
<br />moneys as are, or may hereafter become, available to the
<br />Colorado water conservation board construction fund, an
<br />inventory of all available geohydrologic data of bedrock
<br />aquifers in Colorado west of the continental divide at a cost
<br />to the board not to exceed -thirty-seven thousand five hundred
<br />dollars ($37,500), provided that such casts are matched
<br />eQually by other agencies, entities'- or persons.
<br />
<br />SECTION 4. Study authorization. (1) The Colorado water
<br />conservation board is hereby authorized to make, from such
<br />moneys as are, or may hereafter become, availabie to the
<br />Colorado water conservation board construction func, a
<br />feaSibility study of fish culture techniQues and of fish
<br />hatchery construction and operation for the propagation in
<br />Colorado of threatened and endangered fish of the upper
<br />Colorado river basin at a cost to the board of not more than
<br />three hundred thousand dollars ($300,000).
<br />
<br />(Z) There is hereby appropriated to the Colorado water
<br />conservation board construction fund from the wildlife cash
<br />fund the sum of one hundred fifty thousand dollars (S150,OOO)
<br />. 0 cover half the cost of such feasibility study uoon the
<br />enactment of House Bill No. 1187 by the general assembly in
<br />the 1989 regular session, which bill contains. provision
<br />authorizing the use of wildlife cash fund money far nongame
<br />programs.
<br />
<br />(3) In the event House 6il1 No. 1187 in not enacted, the
<br />Colorado water conservation board is authorized to make the
<br />feaSibility study authorized by subsection (1) of this section
<br />using the full amount of the three hundred thousand oollars
<br />($300,000) from such moneys as are, or may hereafter aecome,
<br />available to the Colorado water conservation board
<br />construction fund.
<br />
<br />SECTION 5. Section 1 (1) of chapter 32, Session Laws of
<br />Colorado 1987, is amended to read:
<br />
<br />Section 1. Project authorizations. (I} Pursuant to
<br />section 37-60-1Z2 (1) (b), Coloraoo Revised Statutes, the
<br />Colorado water conservation board is hereby authorized to ioan
<br />moneys to enable the construction of the following water
<br />resources projects:
<br />
<br />:::,l,
<br />
<br />52
<br />53
<br />54
<br />,-
<br />-,
<br />S6
<br />57
<br />58
<br />59
<br />60
<br />61
<br />62
<br />63
<br />64
<br />65
<br />68
<br />
<br /> Repayment
<br /> Project 80ard Period iota 1
<br />~riority ~ Cost (Years) ReDavmen~
<br />1 Comanche $ .862, 500 2S S 1. 529,850
<br /> Dam
<br />2 P~te!"'son
<br /> Dam 360,000 ZS 674.025
<br />
<br />'0
<br />0'
<br />
|