Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />(1) Cost sharing would be required on a project by <br />project basis. <br /> <br />(2) For the Bonneville Unit I&D system and the phase 2 <br />facilities of the Animas-La Plata Project, 20 percent <br />cost sharing would be required. For all other <br />projects. 30 percent cost sharing would be required. <br /> <br />c. Project specific conditions on use of monies from an <br />escrow account. <br /> <br />(1) Without further Congressional action or approval <br />beyond that contemplated by this agreement, monies <br />could be expended by the states for: <br /> <br />(a) 80 percent of the construction cost of the <br />Bonneville Unit I&D system. <br /> <br />(b) phase 2 facilities of the Animas-La Plata <br />Project. <br /> <br />(c) 70 percent of the total construction cost of <br />any project or projects benefitting the San Miguel <br />Water Conservancy District, Colorado. so long as <br />such project or projects were limited to a total <br />construction cost of $__ million ( price <br />levels); had not more than a total of AF of <br /> <br />-8- <br />