My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting 03/03/1983
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
Board Meeting 03/03/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:03:07 PM
Creation date
10/4/2006 6:57:37 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/3/1983
Description
CWCB Meeting
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />water users. He requested that the Board submit the project to <br /> <br /> <br />the General Assembly for authorization and voiced his opposition <br /> <br /> <br />to the inclusion of Condition No.4 as stated on Table 1, <br /> <br /> <br />attached to Agenda Item 9a (see Appendix G), which required that <br /> <br /> <br />"prior to commencing construction on the project, the District <br /> <br /> <br />shall obtain from the owner(s) of any lands adjacent to the <br /> <br /> <br />reservoir pool (at the maximum water surface elevation) the right <br /> <br /> <br />to receive any appreciation in the value of the lands which is <br /> <br /> <br />attributable to the construction and existence of the reservoir <br /> <br /> <br />if and when those lands or any portion thereof are sold by the <br /> <br /> <br />owner(s). In turn the District shall contract with the Board to <br /> <br /> <br />convey to the Board any monies which it might receive as a result <br /> <br /> <br />of this requirement, said monies to be in addition to the <br /> <br /> <br />payments required by condition No.1, Table 1" (see Appendix G). <br /> <br />Considerable discussion ensued among members of the Board <br /> <br /> <br />concerning the project, particularly with reference to lack of <br /> <br /> <br />immediate demand for water from the project, the fact that some <br /> <br /> <br />of the area surrounding the proposed reservoir was subdivided for <br /> <br /> <br />mountain home sites, the District's ability to repay the Board's <br /> <br /> <br />cost, the relationships between the District and Colorado Ute, <br /> <br /> <br />and the latter's involvement in the project. <br /> <br />The discussion on the Stagecoach Project was concluded and <br /> <br /> <br />action thereon was deferred pending Board consideration of Agenda <br /> <br /> <br />Item 9. Thereupon Chairman Fetcher returned to chair the meeting <br /> <br /> <br />and called for discussion of added Agenda Item Ga, Federal <br /> <br />-3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.