Laserfiche WebLink
<br />" <br /> <br />5.5.6.8 The minimum size spillway for all High Hazard, Significant Hazard, and <br />Large and SmaIl Low Hazard jurisdictional size dams shaIl be capable of passing the <br />inflow design flood generated by a 24-hour, I OO-year rainstorm event. <br /> <br />5.5.7 The HMR PMP used to determine the IDF may be reduced based on the average <br />elevation of the drainage basin. The HMR PMP value may be adjusted for the determination <br />of the IDF for drainage basins above 5,000 (ft) MSL in accordance with the foIlowing: <br /> <br />General Storm <br />East of the Continental Divide <br />Elevation (ft) <br />6,000 to 12,000 <br />Above 12,000 <br /> <br />%Reduction <br />20 <br />30 <br /> <br />West of the Continental Divide <br />Elevation (ft) <br />5,000 to 8,000 <br />Above 8,000 <br /> <br />% Reduction <br />20 <br />30 <br /> <br />Local Storm <br />Statewide <br />Elevation (ft) <br />10,000 to 11,500 <br />11,501 to 13,000 <br />Above 13,000 <br /> <br />%Reduction <br />20 <br />30 <br />40 <br /> <br />INFLOW DESIGN FLOOD REQUIREMENTS <br />REDUCED FOR ELEVATION <br /> <br />Hazard Classification Hieh Sienificant <br />Dam Size <br />Large - General Storm East <br />6,000 - 12,000 ft MSL .8PMP .75 (.8 PMP) <br />Above 12,000 ft MSL .7PMP .75 (.7 PMP) <br />General Storm West <br />5,000 - 8,000 ft MSL .8PMP .75 (.8 PMP) <br />Above 8,000 ft MSL .7PMP .75 (.7 PMP) <br />Local Storm <br />10,000 - 11,500 ft MSL .8PMP .75 (.8 PMP) <br />11,501 - 13,000 ft MSL .7PMP .75 (.7 PMP) <br />Above 13,000 ft MSL .6PMP .75 (.6 PMP) <br /> <br />15 <br />