My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Board Meeting 08/16/1982
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
Board Meeting 08/16/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:02:57 PM
Creation date
10/4/2006 6:57:04 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
8/16/1982
Description
CWCB Meeting
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COLORADO WATER CONSERVATION BOARD <br />Department of Natural Resources <br /> <br />823 State Centennial Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (303l 866-3441 <br /> <br />STATE OF COLORI\DO <br />- <br /> <br />M E M 0 RAN DUM <br /> <br />Richard D. lamm <br />Governor <br /> <br />I. William McDonald <br />Director <br /> <br />TO: <br /> <br />Members, CWCB <br /> <br />David W. Walker <br />Deputy Director <br /> <br />FR0r1 : <br /> <br />~ill ~Icnonald <br /> <br />DATE: <br /> <br />ll.ugust 6, 1982 <br /> <br />SU8JECT: Agenda Item lOa, August 16, 19~2, Board Meeting-- <br />Request for Funding fOt: Study of the Proposed <br />Trans-County project <br /> <br />Introduction <br /> <br />Trans-County Incorporated, a non-profit Colorado <br />Corporation, has made application to the CWCB for funding to <br />conduct a study of the proposed Trans-County Project. A summary <br />of the proposed project and of the status of efforts to form a <br />water conservancy ilistrict to study and develop the project is <br />enclos"!d. <br /> <br />Discussion <br /> <br />Th"! information developed to date on the proposed project is <br />of a very preliminary nature. Furthermore, much of this <br />information has not yet been documented and compiled into the <br />form of a reconnaissance report. <br /> <br />Before one can make an informed judgment about the <br />desirability of expending money for a full-scale feasibility <br />stu<ly, a reconnaissance report needs to be completeil. In <br />addition, the feasibility study, which could cost several hundred <br />thousand dollars, cannot be carefully designed until existing <br /><lata axe compiled and documented. <br /> <br />Recommendation <br /> <br />The engineers for Trans-County have estimated that the <br />preparation of a reconnaissance study report would cost not more <br />than 0;1,400. Since the proposed project clearly meets the <br />criteria set forth in section 37-60-121(1){b), C.R.S. 1973, as <br />amended, I reco~mend that the Board: <br /> <br />(over) <br /> <br />177 <br />ai/lOa <br /> <br />Rob.>rt A. lackson. Ch,lirmiln _ tohn R. Fetcher. Vice Chairman <br />C,'-1. Furne.lux, Flovd L Gelz. Dale F. Grant, Rich,Hd W. JohnSton. Jr., Frederick V. Kroeger. Dawl W. Robbins, Herbert H. V,H,demoer <br />
The URL can be used to link to this page
Your browser does not support the video tag.