My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01532
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01532
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:02:54 PM
Creation date
10/4/2006 6:57:04 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/21/2002
Description
Agenda
Board Meetings - Doc Type
Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-4- <br /> <br />d. <br />e. <br />f. <br /> <br />GUIlllison River Basin Director's Report <br />Glen Canyon Adaptive Management :Program/Colorado River Annual Operating Plan . <br />Colorado River Coordinated Long-Range Operating Criteria - 5 Year Review <br /> <br />19. Platte River Basin Issues. (8:15 - 8:45) <br />a. Denver Director's Report , <br />b. North Platte River Basin Director's Report <br />c. South Platte River Basin Director's Report <br />d. Platte River Cooperative Agreement Status and Update <br /> <br />20. Rio Grande Basin Issues (8:45 - 8:55) <br />a. Rio Grande Basin Director's Report ' <br /> <br />21. Arkansas River Basin Issues (8:55 - 9:15) <br />a. Arkansas River Basin Director's Repprt <br />b. Status Report on Proposed Water Banking Rules <br />c. HR 1714 - Use of Excess Capacity - East Slope Facilities - Fryingpan-Arkansas <br />Project <br /> <br />22. Drought Planning Assessment (9:15-9:35) <br /> <br />23. Flood Protection Program <br />a. Anny Corps of Engineers Budget Report and Colorado Service Center Projects (9:35 . <br />- (9:50) <br />b. South Platte River Easement Request (9:50 - 10:05) <br /> <br />Break 10:05 -10:20 <br /> <br />c. 2002 Flood and Drought Outlook (10:20 - 10:45) <br />d. Flood Response Program Component Update (The components include flood <br />forecasting and preparedness; aerial mapping; flood documentation; evaluation of <br />existingfloodplain designations; and, development of recovery and mitigation plans.) <br />(10:45 - 10:55) . <br />e. Extreme Precipitation Study Update (10:55 - 11 :00) <br />f. Floodplain Mapping Program Propo~al (11 :00 - 11 :20) <br />g. Floodplain Designation Update (11 :~O - 11 :30) <br />h. Technical Document Approval (11 :39 - 11 :45) <br />1. Stream Restoration Program Proposal (11 :45 - 12:05) <br /> <br />Lunch 12:25 -1:25 <br /> <br />24. Future Water Storage, Delivery, Mitigation [fUd Incentives (1:25 - 2:20) <br />25. Agriculture Water Policy Discussion (2:20 --j 4:00) <br />! <br /> <br />Adjourn 4:00 <br /> <br />. <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.