My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01529
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01529
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:02:52 PM
Creation date
10/4/2006 6:57:02 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/24/2000
Description
WSP Section - Colorado River Basin Issues - Ruedi Reservoir - Proposed 1-Year Contract for the Release of 10,825 AF to Endangered Fish in the 15-Mile Reach
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />d. All water releases will be measured at the outlet works by the Contracting Officer with . <br /> <br /> <br />equipment furnished, operated, and maintained by Reclamation. The Service through the <br /> <br /> <br />Recovery Program shall install, operate, maintain, and replace any waterflow measuring and <br /> <br /> <br />recording devices necessary to accept delivery and protect the water in the IS-mile reach. <br /> <br />e. The amount, timing, and rate of the releases from Ruedi Reservoir shall be determined by the <br /> <br />Contracting Officer in consultation with the Service. Reclamation will provide advance <br /> <br />notification to the Board and the Division Engineer for Water Division 5 of the date, time, and <br /> <br />amount of the water released. The Service and Reclamation shall consult with the Board during <br /> <br />the release period to achieve the objectives of Reclamation, the Service, and the Board. <br /> <br />f. The Board is responsible for calling upon the State Engineer for the carriage, use, handling, <br />or distribution of the water beyond the outlet works of Ruedi Reservoir or of an alternate <br />reservoir pursuant to Article 7.a. hereof to the temlinus of the IS-mile reach. The water shall be e <br />subject to such transit losses as may be imposed by the State Engineer or the Division Engineer <br />for Water Division 5. <br /> <br />g. The Service or the Board will not be responsible for the storage of water in, or the operation <br />and maintenance of, Ruedi Reservoir. <br /> <br />4. WATER SERVICE CHARGES AND OTHER COSTS <br /> <br />a. Pursuant to this MOA, the Service will provide a report to Reclamation and the Board not <br />later than March 1,2001, as consideration for the 10,825 acre-feet of water released from the <br />marketable yield of Ruedi Reservoir Round II water sales, hereinafter referred to as Round IL <br /> <br />. <br /> <br />g <br />
The URL can be used to link to this page
Your browser does not support the video tag.