Laserfiche WebLink
<br />ti <br /> <br /> <br />Town of Kremmling <br /> <br />P.O. Box 538 <br />Kremmling, CO 80459-0538 <br /> <br />970/724-3249 <br />970/724-9409 Fax <br /> <br />May 13, 2004 <br /> <br />Tim Feehan <br />Colorado Water Conservation Board <br />]580 Logan Street, Room 750 <br />Denver, CO 80203 <br /> <br />Re: Town ofKremm]ing Loan Request <br /> <br />Dear Mr. Feehan: <br /> <br />. <br /> <br />The Town ofKremm]ing is respectfully requesting your help once again to ensure an <br />adequate water supply for the residents of the Town ofKremmling. We hope that you <br />can support the Town for the additional funding that is needed to complete Kremm]ings <br />raw water pumping project. <br /> <br />The Colorado Water Conservation Board approved a loan for $],000,000 on November <br />26, 2002. Unfortunately, the project was delayed due to the pennitting that was required <br />and completing an agreement with Grand River Ranch, who is the owner of the property <br />where the project will be located and shares the water rights in the Sheep Creek <br />watershed where the Town obtains its current water supply. <br /> <br />At this time the town would like to move forward with the project, however, as with <br />everything, the cost of the project has increased and the funding anticipated from the <br />Ranch in the original loan will not be available. <br /> <br />In order to develop a supplemental water supply for the Town that will meet current as <br />well as future demands the Town is requesting an additional $742,000 30-year loan from <br />the CWCB at 4.25 percent interest. <br /> <br />Thank you for your consideration of funding a project that would provide the ability for <br />the Town to ensure long-term water supplies for its residents. <br /> <br />Sincerely, <br /> <br />. ~:rk ~ <br /> <br />Mayor <br /> <br />