My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01493
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:02:27 PM
Creation date
10/4/2006 6:56:32 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/23/2001
Description
Flood Section - Drought Planning Assessment Update
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />vulnerable systems that serve primarily rural populations such as Deer Trail, Buffalo Creek, etc. <br /> <br />The survey must be tested prior to actual use. <br /> <br /> <br />2 B 5. It is anticipated that the survey will be administered/delivered by multiple methods <br /> <br /> <br />including mail, computer/Internet technology, telephone and in person. The contractor must <br /> <br /> <br />adequately describe the methods it anticipates using in completing the survey. For example, who <br /> <br />will be hired, trained and supervised to survey the organizations that do not respond to the mail, <br /> <br />computer/Internet technology or telephone effort? How will current interactive Internet <br /> <br />technologies be used? <br /> <br />2 B 6. Administer the survey. The survey must be accomplished in a contract time period in <br /> <br />order to facilitate the compilation and analysis of the data and presentation of the results and <br /> <br />products by July of2002. <br />2 B 7. Provide a mid-point project briefing to the adyisory committee. <br /> <br />e <br /> <br />e <br /> <br />Obiective C : The contractor will develop a relational database that is easily accessed, <br /> <br />modified and usable through the Internet. The database will reside on the CWCB website. <br />Tasks: <br /> <br /> <br />2 C 1. Construct the basic database which is based on survey results and includes collected data. <br /> <br /> <br />2 C 2. The contractor will include in the database !'(nd/or provide linkage to the Division of Water <br /> <br /> <br />Resources, information about the ranking in the water rights system in relation to the water <br /> <br />sources. <br /> <br />Also, the contractor will include in the database, arid/or provide linkage to the Division of Water <br /> <br />8 . <br /> <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.