My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01485
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01485
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:02:24 PM
Creation date
10/4/2006 6:56:22 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/19/2001
Description
Flood Section - Floodplain Designations and Approvals
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />statutorily authorized zoning powers. Approximate floodplain information means floodplain . <br />information prepared using a significantly reduced level $f detail to arrive at a hazard delineation <br />without water surface profiles. CWCB staff performs tecpmca1 reviews on the following types of <br />reports and maps for approval and designation by the Bo:\rd: <br /> <br />. "Flood Insurance Study" (FIS), which is produced by the Federal Emergency Management <br />Agency (FEMA) and used for floodplain management, regulation, and insurance purposes. <br />. "Flood Insurance Rate Map" (FIRM), which is proquced by FEMA and used for floodplain <br />management, regulation, and insurance purposes, A (FIRM may be published with or without <br />an associated hydrologic and hydraulic report. : <br />. "Flood Hazard Boundary Map" (FHBM), which )vas produced by the Federal Insurance <br />Administration and are' used for floodplain managetP,ent, regulation, and insurance purposes. <br />An FHBM usually depicts approximate floodplain boundaries only, and does not have an <br />accompanying report, Note: For all FHBM designations, the CWCB staff will perform (in- <br />house or by contract with a consultant) hydrologic ll11alyses. <br />. "Floodplain Information Reports", which are produced by local governments, state and <br />federal agencies, special districts, or the priva~e seCtor, and are used for floodplain <br />management purposes and usually adopted by FEryIA for use in Flood Insurance Rate Map <br />revisions. <br />. Various hydrology studies and related floodplain studies (conununity-wide or site specific) <br />that depict 100-year floodplain information that is useful for floodplain management <br />purposes. . <br />. "Floodplain Information" is a generic term used to describe any of the above types of reports <br />and/or maps in the CWCB's "rules and regulations,. ," <br />. "Floodplain Resolution" is a formal document prepared by CWCB staff describing the <br />Floodplain Information that is to be designated and, approved by the Board. <br /> <br />1) Ae:enda Item 2.a <br />Floodplain resolution number: FPR 01-554 <br />Affected communities: Town of Basalt, Eagle County,' Pitkin County <br />Name of study to be formally acted on: ''Floodplain Information Report, Roaring Fork River, <br />Town of Basalt, Eagle and Pitkin Counties, Colorado": dated October 2001 (revised) - prepared by <br />Matrix Design Group i <br />Studied streams: The report includes detailed 100-year floodplain information for the Roaring <br />Fork River in the vicinity of Basalt, Colorado. The Roaring Fork River is tributary to the. <br />Colorado River <br /> <br />Technical issues: The new floodplain information ryPort was prepared in response to significant <br />concerns-.aIL.:tluLpart of the affected local govemme~ts andCWCB s:taf'L. Preliminary work was: <br />prepared under contract to FEMA by J.F, Sato & Assbciates, The concerns related to modeling of <br />the levee constructed by CDOT immediately adjacetit to and upstream of the Highway 82 Upper <br />Bypass Bridge. Also, a complicated hydraulic condi;~ions exists where a flow split that begins at <br />that levee, flows downstream through the portion of Basalt known as South Side, and then returns . <br />flow from the South Side back to the main river channel. The new model provides for inclusion of <br /> <br />Flood Protection. Water Project Planning and Fin~ncing' Stream and Lake Protection <br />Water Supply Protection. C~nservation Planning <br /> <br />2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.