My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01475
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01475
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:02:16 PM
Creation date
10/4/2006 6:56:13 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/22/2003
Description
CF Section - Design and Construction Status Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866.3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />Bill Owens <br />Governor <br /> <br />MEMORANDUM <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br /> <br />Mike Serlet, P.E., Chieffflj <br />Water Supply Planning ~Finance Section <br /> <br />FROM: <br /> <br />DATE: <br /> <br />January 10, 2003 <br /> <br />SUBJECT: Agenda Item 20 - January 22-23, 2003, Board Meeting <br />Water Supply Planning and Finance <br />Design and Construction Status Report <br /> <br />The complete Design and Construction Status Report is included in the CWCB Director's <br />Report, agenda item 3.c. Tim Feehan, P.E., Design and Construction Project Manager for the <br />Water Supply Planning and Finance Section will deliver a slide presentation of the on-going <br />construction projects and recently completed Construction Fund and Severance Tax water supply <br />projects from around the state. <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.