My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01431
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01431
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:01:53 PM
Creation date
10/4/2006 6:55:37 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/25/2005
Description
ISF Section - Instream Flow Appropriations - Deer Park Creek
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Estimated Stream Flow on Deer Park Creek <br /> <br />15 <br /> <br />5 <br /> <br />10 <br /> <br />Ul <br />'t <br /> <br />o <br /> <br />Jan <br /> <br />Feb <br /> <br />Mar <br /> <br />Apr May Jun <br /> <br />Jul <br /> <br />Aug <br /> <br />Sep Oet <br /> <br />Nov Dee <br /> <br />Month <br /> <br />Existing Water Right Information <br /> <br />Staff has analyzed the water rights tabulation and consulted with the Division Engineer Office <br />(DEO) to identify any potential water availability problems. There are no decreed diversions <br />within this reach. Based on this analysis, staff has determined that water is available for <br />appropriation on Deer Park Creek, from the headwaters down to the confluence with Animas <br />River, to preserve the natural environment to a reasonable degree without limiting or foreclosing <br />the exercise of valid existing water rights. <br /> <br />- 5 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.