Laserfiche WebLink
<br />.. <br /> <br />,.' <br /> <br />90fl8 <br />. Estimated portion of the 60,000 afsubordination being used at this time (i.e. <br />10,000 afin place now) plus use SWSI estimate for future). In narrative <br />recognize that more water may be used. if tr>JRsmO/JRtain diversions MfJ <br />implemented. <br /> <br />. <br /> <br />. Future depletions occurring in the basin. Fer purposes of the BIS, <br />informatioR deW38eped fer the St3te Water S"pply Initiative will be <br />used. This study inGludes a preje6tion of 3dditioRal future <br />depletions 9f 14,900 aGl'fJ feet in the basin by 2030. Include the entire <br />300,000 af project yield (including the full 60,000 af subordination <br />agreement) or limit the EIS to existing uses. <br /> <br />. Dallas Creek M&I exchange (assuming full use ofM&I water staged over time <br />with use and returns occurring above Gunnison-Uncompahgre confluence) in <br />place. High quality Gunnison River is provided for M&I uses in exchange for <br />Ridgway Reservoir water to be used for irrigation. <br /> <br />. Taylor Park agreement and Taylor Park refill right in place. Aspinall Unit <br />operated to protect Uncompahgre Project water stored in Blue Mesa under the <br />agreement. <br /> <br />. <br /> <br />. Narrative recognition of role of Dallas Creek and Dolores Projects' biological <br />opinions that call for upstream reservoir operations 10 offsel depletion impacts. <br />This is difficult to define in terms of operalions. For modeling, assume that the <br />spring peak "shaping", delivery of water to Redlands ladder, and minimum <br />releases downstream from Crystal take care of this. <br /> <br />. <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Planning <br />