My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01407
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01407
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:01:27 PM
Creation date
10/4/2006 6:54:40 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/20/2004
Description
CF Section - New Loans - Henry Bolen Ditch Company - Ditch Pipeline Project
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX, (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />Bill Owens <br />Governor <br /> <br />MEMORANDUM <br /> <br />Russell George <br />Executive Director <br /> <br />FROM: <br /> <br />Colorado Water Conservation Board Members <br /> <br />Kirk Russell, P,E. '(.&'l-~ <br />Mike Serlet, P.E., Chie{~ 'l <br />Water Supply Planning a Finance Section <br /> <br />Rod Kuharich <br />eweB Director <br /> <br />TO: <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />DATE: July 9,2004 <br /> <br />SUBJECT: Agenda Item 14d, July 20-21,2004 Board Meeting <br />Water Supply Planning and Finance Section - New Loans <br />Henry Bolen Ditch Company - Ditch Pipeline Project <br /> <br />Introduction <br /> <br />The Henry Bolen Ditch Company (Company) is applying for an initial loan in the amount of $515,000 <br />from CWCB to install approximately 2.5 miles of new pipeline in the existing ditch corridor for the Henry <br />Bolen Ditch Pipeline Project (Project). The Project will increase ditch efficiency and reduce salinity <br />impacts in the Colorado River. The total Project cost, including engineering and construction, is <br />estimated at $669,500, The Company will receive in-kind engineering services and a grant from NRCS <br />in an amount equal to 75 percent of the final construction cost. NRCS funds will be disbursed to the <br />Company upon completion of the project. The remaining 25 percent of the construction cost will <br />become a 30-year CWCB loan, not to exceed $128,750, See attached Project Data Sheet. <br /> <br />BackClround <br /> <br />The Company is located in Montezuma County near the Town of Mancos, approximately 30 miles <br />west of Durango, The Company manages the Henry Bolen Ditch (Ditch) for the benefit of all seven <br />members as an association of owners with water rights and lands served by the Ditch. The 13,000- <br />foot Ditch is a carriage ditch with a total flow of 12.6cfs, and delivers irrigation water from the <br />Mancos River to the 700-acre service area via diversion structure #534, The Project will provide <br />improved water delivery to all members, which is primarily used for cattle ranching and to grow hay, <br /> <br />The Mancos Valley was added to the USDAlNRCS Colorado River Basin Salinity Control Program. <br />NRCS is administering the Program and providing construction cost sharing and technical <br />assistance using the USDA's Environmentai Quality Incentives Program, Timothy Ouellette of the <br />NRCS, Cortez Service Center is providing planning, design, and field engineering services for this <br />Project. In addition, the Mancos Conservation District has provided iocal assistance by providing <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.