Laserfiche WebLink
<br />"",' <br /> <br />WATER RIGHTS <br /> <br />. <br /> <br />The Riverside Reservoir storage decrees are listed in Table 1. <br /> <br /> TABLE 1 <br /> RIVERSIDE RESERVOIR STORAGE DECREES <br />PRIORITY APPROPRIATION ADJUDICATION AMOUNT <br />NUMBER DATE DATE (ACRE-FEET) REMARKS <br />24 4/1/1902 1115/1914 16,070 Measured in <br />45 81111907 111511914 . 41,437 Measured in <br />77 10/25/1910 1/15/1914 .. . Enough to fill <br /> reservoir to gage <br /> height 34 feet <br />24R 12131/1929 61811965 56,325 Refill, <br /> Measured in <br /> <br />RRLC began several recharge projects in 1972. These plans were operated in some degree <br />in .each of the subsequent years but were never formalized until 1986. In 1986 RRLC <br />began a very aggressive augmentation program. Contracts were signed with landowners <br />who were willing to provide recharge facilities. Riverside agreed to provide the diversion <br />facilities. The credits from the recharge plans were divided among participants according <br />to the percentages listed in Table 2. Each of the participants have developed new irrigated . <br />land or projects using their share of the recharge credits. RRLC's share of the credits are <br />divided on a pro rata basis to each of the 2,505 shares in the company. Most of these <br />credits are used to replace out-of-priority depletions caused by wells constructed prior to <br />1972. <br /> <br /> TABLE 2 <br /> RIVERSIDE RESERVOIR RECHARGE DECREES <br /> RIVERSIDE 1996 <br />PARTNER PERCENT DECREE DATE RECHARGE <br />NAME OWNERSHIP NUMBER DECREED (RRLC %1 <br />Equus Farms 60% 88CW239 3/3/1988 3.745 AF <br />National Hog Farm 60% 88CW264 11/411988 1.163 AF <br />Sublette 60% 89CW207 4/27/1989 3,028 AF <br /> <br />COST ESTIMATE <br /> <br />The selected spillway construction Alternative 2b is estimated to cost a total of about <br />$230,000. The project design will be performed by the company's engineer in cooperation <br /> <br />12 <br /> <br />. <br />