Laserfiche WebLink
<br /><~ <br /> <br />" <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.U5 <br /> <br /> <br />To: <br /> <br />From: <br /> <br />Date: <br /> <br />Subject: <br /> <br />MEMORANDUM <br /> <br />Bill Owens <br />Governor <br /> <br />Colorado Water con~srv' oard <br /> <br />Rod Kuharich, Direc <br />Rick Brown, Project ager, Interstate Stream Protection <br /> <br />Russell George <br />Executive Director <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />September 15, 2004 <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Agenda Item 20, September 14-15,2004 Board Meeting, <br />Statewide Water Supply Initiative (SWSI) Implementation Update <br /> <br />The Statewide Water Supply Initiative (SWSI) team is in the process of completing the fmal round of Basin <br />Technical Roundtable (BRT) meetings, and we have begun drafting our final report and executive summary. <br />At the time of the CWCB notebook mailing the team will still need to conduct two BRT meetings. Given this <br />schedule it will be difficult to complete written information for inclusion in your notebook. However, written <br />information will be available in time for the actual CWCB meeting and will be handed out during the <br />meeting. <br /> <br />The SWSI team will present information on the following topics: <br /> <br />1. Summary of Major Findings (attached to this memorandum) <br /> <br />2. Summary ofBRT #4 Meetings <br /> <br />3. Discussion of: A) Water Supply Options for Remaining Gap and B) Water Supply Options for the <br />Gap Associated with the Uncertainty in Identified Projects and Processes. The Board will be <br />presented with a summary of feedback from the BRTs, and the SWSI team will solicit feedback as to <br />the level of detail we should go into regarding the Water Supply Options for these two categories of <br />water supply needs. <br /> <br />4. Final Report and Recommendations <br /> <br />. Review of time line for SWSI completion <br />. Presentation of Preliminary Draft of the Executive Summary <br />. CWCB Implementation Plan - A conceptual outline of post-November activities will be <br />presented. This will include: <br />i. Resource Allocation- activities for CWCB staff and contractor support <br />ii. Discussion of Post-November Work on Statewide River Basin Issues (clarifY CWCB <br />resolution from the July 2004 CWCB meeting) <br />iii. Financial considerations for structural and non-structural projects for Water Supply <br />Options for remaining gap (topic 3 A from above) <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />