My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01387
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01387
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:01:11 PM
Creation date
10/4/2006 6:54:18 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/19/2001
Description
CF Section - Policy Review - Policy #7 - Annual Construction Fund and the Severance Tax Trust Fund Perpetual Base Account Lending Rate Determination
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />t <br /> <br />. <br /> <br />e <br /> <br />e <br /> <br />.: <br /> <br />STATE OF COLORADO <br /> <br />Q <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />n13 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (3031 866,3441 <br />fAX: (3031 866-4474 <br />www.cwcb.state.co.u5 <br /> <br />Bill Owens <br />Governor <br />Greg E. Walcher <br />Executive Director <br />Rod Kuharich <br />eWeB Director <br />Dan McAuliffe <br />Deputy Director <br /> <br />MEMORANDUM <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br /> <br />Mike Serlet, P.E., Chief IJJ ( <br />Water Supply Planning at~nance Section <br /> <br />FROM: <br /> <br />DATE: November 9, 2001 <br /> <br />SUBJECT: Agenda Item 19a - November 19-20,2001, Board Meeting <br />Water Supply Planning and Finanee - Policy Review <br />Policy #7 - Annual Construetion Fund and the Severanee Tax Trust Fund <br />Perpetual Base Account Lending Rate Determination <br /> <br />Introduction <br />This memorandum outlines suggested revisions to the Board's existing policy on lending <br />rates, Policy #7. In order to provide 1.) The Board with the ability to more efficiently fulfill its <br />responsibility of providing low interest water project loans to the State's water users, 2.) <br />Certainty for borrowers interested in the Board's interest rates when commencing the loan <br />application process during the year, and 3_) Linkage of agricultural interest rates to other loan <br />categories. <br /> <br />Proposal/Diseussion <br />1. Staff is proposing the interest rate calculations be adjusted so as to remain in line with <br />other providers of water project funding sources. The CWCB rates somewhat compare to <br />the Water and Power Authority, Rural Development, and Local Affairs, however, the <br />applicant is required to perform a feasibility study for CWCB loan projects. Sometimes <br />the feasibility study requirement, together with the time constraint of the legislative <br />process, is the deciding factor when all applicant pursues funds from the other lending <br />sources. A more favorable interest rate may provide the incentive necessary for a project <br />sponsor to borrow from the CWCB rather than from another source. <br /> <br />In order to make the proposed adjustment, the average yield for the 30-year "A" rated <br />municipal bond would be equal to the Baseline Rate rather than the Municipal High <br />Income Rate. The rates for the C011Ullercial and Municipal borrowers would then be <br />calculated relative to the Baseline Rate as 110% for the Commercial rate, 90% for the <br />Municipal High Income, 80% for the Municipal Middle Income, and 70% for the <br />Municipal Low Income. The table below shows the comparison between the current <br />calculation and the proposed calculations. <br /> <br />Flood Protection. Water Project Planning and Financing. Stream and lake Protection <br />Water Supply Protection. Conservation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.