My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01373
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01373
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:01:08 PM
Creation date
10/4/2006 6:54:15 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/10/2002
Description
CF Section - CRRP - Review Scope of Work
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,3, <br /> <br />Colorado River Main-Stem Backeround Information <br /> <br />Task 4 - Overview of the Physical Environment <br /> <br />Task 5 - Institutional Setting <br /> <br />Alternatives and Strateeies <br /> <br />Task 6 - Overview of Water Supply Alternatives to the CRRP <br /> <br />Task 7 - Fonnulation of Project Configurations <br /> <br />Task 8 - Evaluation of Project Configurations <br /> <br />Task 9 - Documentation and Justification of Selected Configuration <br /> <br />Task 10 - Project Development Strategies <br /> <br />Documentation <br /> <br />Task 11 -Study Documentation <br /> <br />Study Process <br /> <br /> <br />k <br />tp ~7 <br />ll~) z~ <br /> <br />\V'7h';'vrt 2 ,~1-~1') vV~ tft! <br />~ 11 r,r jJ,:,...T' l(IY" vJ. ...sr \.,...; <br />, 19 ~ r ),.\. V I ~ 1.-" V 1?.1' <br />>> "i~V11 y'^" VI ,)-t;; \-"'1'}l-<> <br />CIJ \If' CP .yI 4 vi \1 r \v _ :v <br />~~ vi .\4 ~,,1i ,<v \IV"" <br />iew existing data for the study and to finalize <br /> <br />The overview of the physical environment and ' stitutional settings are described in Tasks 4 and 5 <br />below under Detailed Work Tasks, The level of detail in Tasks 4 and 5 will be fairly general but <br />adequate for use in later study tasks. <br /> <br />T ne a eas! ' ct. Task 6 will briefly analyz(l~le ~ <br />alternatives to the construction of the CRRP Thos~ 3lt~tiv<,s m<1Y inrl'lGe agricultural transfers to <br />municipal and industrial uses, water conservatio1Jand,\~emand managementf'. . C+t a: J' , <br />/{VIJ ~ r'''''47~ .- <br />It is expected that the major portion of the study budget will be devoted to the work required in <br />Tasks 7 through 10, <br />"t <br /> <br />Study Tasks 1, 2 and 3 are intended to collect and r <br />the scope of work <br /> <br /> <br />Project facility configurations will be fonnulated and evaluated in Tasks 7, 8 and 9 to address the <br />issues and problems identified in the design, pennitting, constmction and operation ofthe project. It <br />is expected that a large number of structural and non-structural plan elements will be used in various <br />configurations and evaluated in a multi-step screening process leading to the selection of one or <br />more preferred project configurations, <br /> <br />Strategies for implementation of the preferred project configurations will be developed in Task 10, <br />The strategies will include measures that could be taken on a local, regional or state-wide basis such <br /> <br />Flood Protection. Water Project Plarming and Financing. Stream and Lake Protection <br />Water Supply Protection. Conservation Plaruting <br />
The URL can be used to link to this page
Your browser does not support the video tag.