My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01370
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01370
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:01:03 PM
Creation date
10/4/2006 6:54:10 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/23/1998
Description
Flood Section - Floodplain Designations and Approvals - Existing Conditions and Future Conditions Floodplain Delineations and Designations
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />ATTACHMENT 1 <br /> <br />Big Dry Creek Flood Hydrology <br /> <br />"Existing Conditions" vs. "Future Conditions" <br /> <br />Location "Existing Conditions" "Future Conditions" <br /> , , Flows Flows <br />1-25 8800cfs 11,200 cfs <br />120"' Ave, 8100 cfs 8100 cfs <br />Upstream of confluence with 6900 cfs 6900 cfs <br />Airport Creek <br />Downstream of Boulder Turnpike 5700 cfs 6100 cfs <br />Upstream of confluence with 3000 cfs 3700 cfs <br />Walnut Creek <br />Standley Lake outflow 700 cfs 1500 cfs <br /> <br />Note: When "future conditions" flows are equal to "existing conditions" flows, the <br />reason is that inadvertent detention by road and/or railroad embankments cancels out any <br />increases to the flows due to future urbanization, for the stream reach immediatelv <br />upstream of that road or railroad. <br />
The URL can be used to link to this page
Your browser does not support the video tag.