Laserfiche WebLink
<br />. <br /> <br />, <br /> <br />CO-MANAGEMENT OF THE WATER RlGHTS <br />.FOR THE MONUMENT AND ASPINALL UNIT <br /> <br />Priority would shift among the following: <br /> <br />. A y~ar round minimum flow (300 cfs), <br />. A spring season (May-June) peak flow (3,500 to 12,000+ cfs) with <br />appropriate ramping rates, <br />. Shoulder flows up to 800 cfs, <br />. Flood control, <br />. Compact deliveries, <br />. Yield from Aspinall (-240,000 AFY), <br />. Reservoir storage targets (e.g. to fill Blue Mesa Reservoir, minimize <br />. ice jam flooding above Blue Mesa Reservoir), <br />. Hydropower generation, <br />. Recreation in the Gunnison Gorge and at Curecanti NRA, <br />. Endangered species needs. <br /> <br />Priority would be determined based on the following <br />factors: <br /> <br />. Expected runoff volume. <br />. Pre-runoff season reservoir content. <br />. Season of the year. <br />. Capabilities of the physical structures, <br /> <br />. <br />