<br />/ <br /> <br />Owl Creek Reservoir Company <br />Loan Increase <br /> <br />Agenda Item 26b <br />March 17, 2004 <br /> <br />. <br /> <br />2, Reconstruct existing darn embankment, construct new outlet structure and spillway and <br />dredge reservoir to a capacity of 1,200 acre-feet. <br />3. Reconstruct existing darn embankment, construct new outlet structure and spillway and <br />dredge reseIVoir to a capacity of 1,750 acre-feet. <br /> <br />Alternatives No.1 - was unacceptable, since it only maintained the existing capacity of the reseIVoir and <br />did not allow the Company to exercise its full water right. Bid Cost = $936,318 <br /> <br />Alternative No.2 - was the Company's original preferred alternative, as presented at the November <br />2001 Board Meeting, Upon further evaluation of the site, completion of the final design, and upon <br />receiving actual construction bids in May of 2003, it was determined that this alternative was not in the <br />best interest of the Company. The $0,81 per cubic yard bid submitted by the Contractor to dredge the <br />reseIVoir, has made it feasible for the Company to look at creating the full 1,750 acre-feet storage right <br />of the reseIVoir. The following is the estimated cost of Alternative No.2, as presented in November of <br />2001, compared with the bid results received from the low bidder: <br /> <br />Alternative No.2 Cost Estimate <br /> <br />. <br /> <br />Proiect Item Original Cost Estimate R.E. Monk Bid <br />Mobilization, Bonds, Insurance, $0 $169,525 <br />Seeding, Utilties, Water, etc. <br />Embankment, Spillway, Toe Drain $390,000 $438,021 <br />Outlet Structure $100,000 $296,982 <br />Instrumentation $45,000 $32,000 <br />Dredging $375,000 $303,750 <br />Design Engineering $150,000 $294,000 <br />Inspection, Testing, Surveying, and $190,000 $206,077 <br />Contingency <br />Total: $1,250,000 $1,740,355 <br /> <br />In comparing the original cost estimate of$I,250,000 for Alternative No.2, with the $1,740,355 cost <br />provided by the Contractor, the total project cost to design and construct Alternative No.2 has increased <br />by $490,355. This was mainly due to higher engineering costs, higher construction cost for the outlet, <br />and not including a high enough contingency for mobilization, bonding, and construction water, <br /> <br />Alternative No.3 was selected - since it allows the Company to achieve the full 1,750 acre-feet storage <br />right. The decision to go with this alternative was largely due to the dredging bid price received from <br />the Contractor, as previously mentioned. The following is a summary of the design and construction <br />cost for Alternative No. 3, based on R.E, Monk's bid. <br /> <br />Alternative No.3 Cost Estimate <br /> <br />. <br /> <br />Proiect Item Estimated Cost <br />Mobilization, Bonds, and Insurance $31,000 <br />Site Preparation $40,400 <br />Darn Embankment $380,739 <br />Outlet Works $296,982 <br />Spillway $89,282 <br />Dredging - 1,666,500 cubic yards $1,349,865 <br />Seeding, Surveying, Utilities, Water, Resurfacing $98,125 <br /> <br />3 <br />