My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01321
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01321
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:00:18 PM
Creation date
10/4/2006 6:53:18 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
3/7/1961
Description
Minutes and Resolution
Board Meetings - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />prepared. Back in April of 1941, Mr. Howard, <br />the then General Counsel for the Metropolitan <br />Water District of Southern California and who, <br />at that time, was Chairman of the Conference <br />of Power Contractors from aoover Dam, spoke on <br />this matter as follows: <br /> <br />'- - - No one asked the United States to <br />"guarantee" the presence of water in 'the <br />required amount.' <br /> <br />This guotation had to do with the production <br />of firm energy. Yet at this stage in the <br />game, we, the Upper Basin, are asked in effect <br />to guarantee water in the required amounts. <br />And then Mr. Howard went on to state: <br /> <br />- To agree to pay for the works - - - <br />regardless of the amount of energy actually <br />delivered was not considered good business. <br />particularly in view of the fact that up- <br />stream diversions, which might contribute to <br />the reduction in firm energy were not within <br />the control of the power contractors.' <br /> <br />I <br /> <br />Now everyone fully realized that when <br />these contracts were entered into, they were <br />entered into on a basis of pure assumptions. <br />One, as to upstream depletion by the Upper <br />Basin states and two, as to the actual amount <br />of water flowing in the river. Neither of <br />those assumptions have lived up to expecta- <br />tions. The upstream depletion has occurred <br />faster than was contemplated and the flow of <br />the river has been less than the flow of the <br />river was known to be at that time. That <br />these assumptions could be erroneous ~ fully <br />contemplated and understood by all parties, <br />and each power contract that was entered into <br />by the United States, each and everyone of <br />tham now in existence, has the following <br />clause in it: <br /> <br />'Should the delivery of water for any <br />reason or cause, - - - be discontinued or <br />reduced below the amount required for the <br />generation of firm energy - - <br />
The URL can be used to link to this page
Your browser does not support the video tag.