My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01316
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01316
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 3:00:10 PM
Creation date
10/4/2006 6:53:11 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/13/2005
Description
WSP Section - Silverthorne (RICD) Continuation of Hearing and/or Deliberations
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />3. The Applicant will consult with the DOW and the CWCB before and during the <br />construction of the RICD structures to assure that the RICO construction will not injure the <br />natural environment that the ISF protects. <br /> <br />4. The Applicant will clarify in the decree that the Memorial Day and Labor Day Level II <br />flows will occur on Friday, Saturday, Sunday, and Monday. In addition, the Applicant will <br />clarify in the decree that the Fourth of July Level II flows will occur as follows: I) if the Fourth <br />of July is on a Thursday, the flows will occur on Thursday, Friday, Saturday and Sunday; 2) if <br />the Fourth of July is on a Friday, Saturday, Sunday or Monday, then the flows will occur on <br />Friday, Saturday, Sunday and Monday; 3) ifthe Fourth of July is on a Tuesday, then the flows <br />will occur on Saturday, Sunday, Monday and Tuesday; and, 4) if the Fourth of July is on a <br />Wednesday, then the holiday flows will occur only on Wednesday. <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.