My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BOARD01277
CWCB
>
Board Meetings
>
Backfile
>
1001-2000
>
BOARD01277
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:59:41 PM
Creation date
10/4/2006 6:52:33 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
1/27/1999
Description
ISF Section - Proposed Injury with Mitigation/Modification - Case No. 5-97CW306, EMD LLC et. Al.
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />Glenn E. Porza.", <br />Michael F. Browning <br />Richard A. Johnson <br />George V. Berg, Jr. <br />Steven J. Bushong <br />Michael J. Repucci <br /> <br />Porzak Browning & Johnson LLP <br /> <br />ATTORNEYS .AT .LAW <br /> <br />929 Pearl Street, Suite 300 . 3olllder, CO 80302 <br />303 443,6800 . Fax 303 443,6864 <br /> <br />Wm, lke Krasniewicz <br />.luli::; Schoenfeld <br />Kathleen 1vI. Morgan <br /> <br />RECEWED <br />,IAN?' 0 1999 <br /> <br />Of Counsel: <br />Neil C. King, P.c. <br /> <br />FOR PURPOSES OF SETTLEMENT <br />AND COMPROMISE ONLY <br /> <br />Co\o~8.-:::0 'Natsr <br />conservation Board <br /> <br />January 19, 1998 <br /> <br />VL4 FACSIMILE 303-866-3558 <br />Jennifer Gimbel, Esq, <br />Assistant Attorney General <br />Natural Resources Section <br />1525 Sherman Street, 5th Floor <br />Denver, CO 80203 <br /> <br />VIA FACSIMILE 303-866-4474 <br />Greg Espegren <br />Colorado Water Conservation Board <br />721 Centennial Building <br />1313 Sherman Street <br />Denver, CO 80203 <br /> <br />Re: Case No, 97CW306, Water Division No, 5 <br /> <br />Dear Jennifer and Greg: <br /> <br />. <br /> <br />Per our telephone conversation last week, the following are the alternatives that EMD <br />LLC has considered with respect to achieving a stipulation with the CWCB in the above- <br />referenced matter: <br /> <br />1. EMD LLC Alternative, This alternative requires EMD LLC to move its <br />municipal diversion point downstream to the Raw Water Booster Pump whenever instream flows <br />are inadequate to satisfY the CWCB's water rights and to replace all depletions with upstream <br />sources of water. As we have previously discussed, such a downstream change in EMD LLC's <br />senior irrigation water rights removes a large historic impact to the Eagle River, thus adding <br />water to approximately a 2-3 mile reach of the Eagle River, including during the critical month <br />of September. Moreover, any future impacts are limited to the 300 foot reach between the Raw <br />Water Booster Pump and the municipal outfall. This approach is the most desirable for EMD <br />LLC, <br /> <br />2. CWCB Staff Alternative, The proposal by the CWCB Staff was considered and <br />rejected by EMD LLC. This proposal would require EMD LLC to acquire sufficient storage to <br />replace 100% of its diversions (primarily during the nonirrigation season) whenever the CWCB' s <br />instream flow rights are not being met downstream of the Raw Water Booster Pump. As a <br />practical matter, since 95% of the winter diversions return to the Eagle River within 300 feet of <br />the municipal diversion point, this alternative requires EMD LLC to replace approximately 20 <br /> <br />. sb0530 <br />
The URL can be used to link to this page
Your browser does not support the video tag.